GA optimization model for repetitive projects with soft logic
暂无分享,去创建一个
[1] Rehab Reda,et al. RPM: Repetitive Project Modeling , 1990 .
[2] Weng Tat Chan,et al. CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .
[3] D. E. Goldberg,et al. Genetic Algorithms in Search , 1989 .
[4] James E. Diekmann,et al. Soft Logic in Network Analysis , 1988 .
[5] Ming-Teh Wang,et al. Development of an object-oriented scheduling model for construction projects , 2003 .
[6] Ying Xiong,et al. Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off , 2008 .
[7] Ahmed Senouci,et al. A time – cost trade-off algorithm for nonserial linear projects , 1996 .
[8] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[9] Ahmed Senouci,et al. Use of Genetic Algorithms in Resource Scheduling of Construction Projects , 2004 .
[10] John H. Holland,et al. Building Blocks, Cohort Genetic Algorithms, and Hyperplane-Defined Functions , 2000, Evolutionary Computation.
[11] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[12] William Prager. A Structural Method of Computing Project Cost Polygons , 1963 .
[13] Ario Ohsato,et al. A genetic algorithm-based method for scheduling repetitive construction projects , 2009 .
[14] Jeffrey Harr,et al. Building Blocks , 2013 .
[15] Bryan Christopher Que. INCORPORATING PRACTICABILITY INTO GENETIC ALGORITHM-BASED TIME-COST OPTIMIZATION , 2002 .
[16] Khaled A El-Rayes,et al. Scheduling of repetitive projects with cost optimization , 1993 .
[17] Tarek Hegazy,et al. COST OPTIMIZATION IN PROJECTS WITH REPETITIVE NONSERIAL ACTIVITIES , 2001 .
[18] Kuo-Shun Sun,et al. A GA optimization model for workgroup-based repetitive scheduling (WoRSM) , 2009, Adv. Eng. Softw..
[19] Chuntian Cheng,et al. Optimizing Hydropower Reservoir Operation Using Hybrid Genetic Algorithm and Chaos , 2008 .
[20] C. L. Wu,et al. A flood forecasting neural network model with genetic algorithm , 2006 .
[21] Chung-Wei Feng,et al. Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .
[22] Po-Han Chen,et al. A two-phase GA model for resource-constrained project scheduling , 2009 .
[23] A. Samer Ezeldin,et al. Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects , 2009 .
[24] Abbas Afshar,et al. Fuzzy-based MOGA approach to stochastic time-cost trade-off problem , 2009 .
[25] Osama Moselhi,et al. Schedule compression using the direct stiffness method , 1993 .
[26] Sou-Sen Leu,et al. OPTIMAL REPETITIVE SCHEDULING MODEL WITH SHAREABLE RESOURCE CONSTRAINT , 2001 .
[27] Maged Georgy,et al. Evolutionary resource scheduler for linear projects , 2008 .
[28] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[29] D. K. H. Chua Senior,et al. A TIME-COST TRADE-OFF MODEL WITH RESOURCE CONSIDERATION USING GENETIC ALGORITHM , 1997 .
[30] Mohan M. Kumaraswamy,et al. Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization , 2005 .
[31] James D. Lutz,et al. Planning repetitive construction: Current practice , 1993 .
[32] Jennifer Treuting,et al. Building blocks , 2007, SIGGRAPH '07.
[33] Leen S. Kang,et al. Optimal Schedule Planning for Multiple, Repetitive Construction Process , 2001 .
[34] K. Chau,et al. Neural network and genetic programming for modelling coastal algal blooms , 2006 .
[35] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .