Disassembly for remanufacturing: a systematic literature review, new model development and future research needs
暂无分享,去创建一个
[1] Winifred Ijomah,et al. Application of active disassembly to extend profitable remanufacturing in small electrical and electronic products , 2010 .
[2] Mohamad Y. Jaber,et al. An economic production and remanufacturing model with learning effects , 2011 .
[3] Bert Bras,et al. Issues in the Automotive Parts Remanufacturing Industry - A Discussion of Results from Surveys Performed among Remanufacturers , 1998 .
[4] Barbara B. Flynn,et al. Empirical research methods in operations management , 1990 .
[5] Erik Sundin,et al. Exploring inter-organizational relationships in automotive component remanufacturing , 2014 .
[6] D. C. Whybark,et al. From garbage to goods: Successful remanufacturing systems and skills , 2000 .
[7] Ian M. Langella. Heuristics for demand-driven disassembly planning , 2007, Comput. Oper. Res..
[8] R. G. Fenton,et al. Analysis of Remanufacturer Waste Streams Across Product Sectors , 2001 .
[9] Muris Lage Junior,et al. Production planning and control for remanufacturing: literature review and analysis , 2012 .
[10] Surendra M. Gupta,et al. Performance improvement potential of sensor embedded products in environmental supply chains , 2011 .
[11] Geraldo Ferrer,et al. MATERIAL PLANNING FOR A REMANUFACTURING FACILITY , 2001 .
[12] K. Peattie,et al. Meeting the Closed-Loop Challenge: The Case of Remanufacturing , 2004 .
[13] Gilvan C. Souza,et al. MIXED ASSEMBLY AND DISASSEMBLY OPERATIONS FOR REMANUFACTURING , 2003 .
[14] Geraldo Ferrer. Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..
[15] Michael E. Ketzenberg,et al. Value of Information in Closed Loop Supply Chains , 2006 .
[16] Hwa-Cho Yi,et al. A study on the method of disassembly time evaluation of a product using work factor method , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).
[17] Carsten Franke,et al. Remanufacturing of mobile phones—capacity, program and facility adaptation planning , 2006 .
[18] Vaidyanathan Jayaraman,et al. Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach , 2006 .
[19] Yanbin Du,et al. An integrated method for evaluating the remanufacturability of used machine tool , 2012 .
[20] Anil Mital,et al. Incorporating work factors in design for disassembly in product design , 2005 .
[21] R. W. Grubbström,et al. Planned lead time determination in a make-to-order remanufacturing system , 2007 .
[22] Abe Zeid,et al. Pricing decisions in a multi-criteria setting for product recovery facilities , 2011 .
[23] Surendra M. Gupta,et al. A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..
[24] W. L. Ijomah. A tool to improve training and operational effectiveness in remanufacturing , 2008, Int. J. Comput. Integr. Manuf..
[25] Zhenqi Zhu,et al. The challenges and Importance of Knowledge Management in Remanufacturing , 2008 .
[26] W. C. Benton,et al. Supply-Chain Management for Recoverable Manufacturing Systems , 2000, Interfaces.
[27] Askiner Güngör. Evaluation of connection types in design for disassembly (DFD) using analytic network process , 2006, Comput. Ind. Eng..
[28] Surendra M. Gupta,et al. Near optimal buffer allocation in remanufacturing systems with N-policy , 2010, Comput. Ind. Eng..
[29] Chris Ryan,et al. Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Australia , 2001 .
[30] MengChu Zhou,et al. Disassembly modeling, planning, and application , 2002 .
[31] Wei-Chang Yeh,et al. Simplified swarm optimization in disassembly sequencing problems with learning effects , 2012, Comput. Oper. Res..
[32] Winifred Ijomah,et al. Addressing decision making for remanufacturing operations and design-for-remanufacture , 2009 .
[33] Surendra M. Gupta,et al. Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..
[34] V. Daniel R. Guide,et al. Supply Chain Sourcing in Remanufacturing Operations: An Empirical Investigation of Remake Versus Buy , 2010, Decis. Sci..
[35] Olga Battaïa,et al. A decision support system to manage the quality of End-of-Life products in disassembly systems , 2016 .
[36] S. G. Li,et al. The research of online price quotation for the automobile parts exchange programme , 2009, Int. J. Comput. Integr. Manuf..
[37] Christos Zikopoulos,et al. On the attractiveness of sorting before disassembly in remanufacturing , 2008 .
[38] Cheng-Han Wu. OEM product design in a price competition with remanufactured product , 2013 .
[39] A. Lambert. Determining optimum disassembly sequences in electronic equipment , 2002 .
[40] D. Huisingh,et al. Remanufacturing for the automotive aftermarket-strategic factors: literature review and future research needs , 2009 .
[41] Marco Santochi,et al. Computer Aided Disassembly Planning: State of the Art and Perspectives , 2002 .
[42] D. Tranfield,et al. Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .
[43] Bert Bras,et al. Product, process, and organizational design for remanufacture – an overview of research , 1999 .
[44] Kenichi Nakashima,et al. Enhancing value in reverse supply chains by sorting before product recovery , 2012 .
[45] Helmut Bley,et al. Appropriate Human Involvement in Assembly and Disassembly , 2004 .
[46] J. D. Chiodo,et al. Use of active disassembly technology to improve remanufacturing productivity: automotive application , 2014, Int. J. Comput. Integr. Manuf..
[47] M. Eugene Merchant,et al. A WEB-BASED SYSTEM FOR REVERSE MANUFACTURING AND PRODUCT ENVIRONMENTAL IMPACT ASSESSMENT CONSIDERING END-OF-LIFE DISPOSITIONS , 2004 .
[48] Karl Inderfurth,et al. How Yield Process Misspecification Affects the Solution of Disassemble-to-order Problems , 2015 .
[49] Christos Zikopoulos,et al. Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites , 2008 .
[50] Fabrice Mathieux,et al. ReSICLED: a new Recovery Conscious Design method for complex products based on a multicriteria assessment of the recoverability. , 2008 .
[51] Shana Smith,et al. Rule-based recursive selective disassembly sequence planning for green design , 2011, Adv. Eng. Informatics.
[52] Surendra M. Gupta,et al. Disassembly to order system under uncertainty , 2006 .
[53] Surendra M. Gupta,et al. Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..
[54] Nam Wook Cho,et al. A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations , 2010 .
[55] E. Sundin,et al. Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .
[56] Wolfgang Grimm,et al. Reuse of Electric Motors in Consumer Products , 1998 .
[57] Winifred Louissa Ijomah,et al. A MODEL-BASED DEFINITION OF THE GENERIC REMANUFACTURING BUSINESS PROCESS , 2002 .
[58] Rizauddin Ramli,et al. Disassemblability of end-of-life vehicle: a critical review of evaluation methods , 2011 .
[59] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[60] Marc Salomon,et al. Strategic Issues in Product Recovery Management , 1995 .
[61] Myer Kutz,et al. Environmentally conscious mechanical design , 2007 .
[62] Aldo Roberto Ometto,et al. Ecodesign methods focused on remanufacturing , 2010 .
[63] Surendra M. Gupta,et al. Disassembly sequence planning for products with defective parts in product recovery , 1998 .
[64] Gregory C. Smith,et al. Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning , 2012, Adv. Eng. Informatics.
[65] Erik Sundin,et al. Design for automatic end‐of‐life processes , 2012 .
[66] Winifred Ijomah,et al. Remanufacturing: a key strategy for sustainable development , 2004 .
[67] Surendra M. Gupta,et al. A path-relinking approach for a bi-criteria disassembly sequencing problem , 2008, Comput. Oper. Res..
[68] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[69] Peggy Zwolinski,et al. A tool to implement sustainable end-of-life strategies in the product development phase , 2005 .
[70] Ajd Fred Lambert,et al. Disassembly sequencing: A survey , 2003 .
[71] John S. Usher,et al. Production planning for remanufactured products , 2007 .
[72] Peggy Zwolinski,et al. Remanufacturing strategies to support product design and redesign , 2008 .
[73] Ali Mousavi,et al. A computer-based product classification and component detection for demanufacturing processes , 2011, Int. J. Comput. Integr. Manuf..
[74] Geraldo Ferrer,et al. Value of information in remanufacturing complex products , 2004 .
[75] Ulrich Nissen. A methodology for the development of cleaner products , 1995 .
[76] Chettiyappan Visvanathan,et al. Resources, Conservation and Recycling , 2011 .
[77] Bert Bras. Design for Remanufacturing Processes , 2015 .
[78] R. G. Fenton,et al. Supporting Design for Remanufacture through Waste-Stream Analysis of Automotive Remanufacturers , 2000 .
[79] Cheng-Han Wu,et al. Product-design and pricing strategies with remanufacturing , 2012, Eur. J. Oper. Res..
[80] Spyros Reveliotis,et al. Uncertainty management in optimal disassembly planning through learning-based strategies , 2007 .
[81] O. Tang,et al. The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufacturing system , 2004 .
[82] Guangdong Tian,et al. Energy evaluation method and its optimization models for process planning with stochastic characteristics: A case study in disassembly decision-making , 2012, Comput. Ind. Eng..
[83] E. Sundin,et al. Managing the Remanufacturing Organization for an Optimal Product Life Cycle , 2005, 2005 4th International Symposium on Environmentally Conscious Design and Inverse Manufacturing.
[84] George Chryssolouris,et al. Assembly system design and operations for product variety , 2011 .
[85] Geraldo Ferrer. On the widget remanufacturing operation , 2001, Eur. J. Oper. Res..
[86] Johan Östlin,et al. Importance of closed-loop supply chain relationships for product remanufacturing , 2008 .
[87] Anil Mital,et al. Evaluation of disassemblability to enable design for disassembly in mass production , 2003 .
[88] James F. C. Windmill,et al. Design for remanufacture: a literature review and future research needs , 2011 .
[89] Carsten Franke,et al. Process and Facility Planning for Mobile Phone Remanufacturing , 2004 .
[90] Hak-Soo Mok,et al. Disassemblability of Mechanical Parts in Automobile for Recycling of Materials , 1996 .
[91] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[92] David W. Rosen,et al. A virtual prototyping approach to product disassembly reasoning , 1997, Comput. Aided Des..
[93] L. H. Shu,et al. Application of a design-for-remanufacture framework to the selection of product life-cycle fastening and joining methods , 1999 .
[94] E. Westkämper,et al. Assembly and Disassembly Processes in Product Life Cycle Perspectives , 2003 .
[95] A. R. Ometto,et al. Remanufacturing in Brazil: case studies on the automotive sector , 2013 .
[96] Geoffrey P. Hammond,et al. Development of robust design-for-remanufacturing guidelines to further the aims of sustainable development , 2007 .
[97] Hui-Ming Wee,et al. Green-product-design value and information-technology investment on replenishment model with remanufacturing , 2010, Int. J. Comput. Integr. Manuf..