Disassembly for remanufacturing: a systematic literature review, new model development and future research needs

Purpose:  Disassembly is an important process that distinguishes remanufacturing from conventional manufacturing. It is a unique process that becomes focus of investigation from many scholars. Yet, most scholars investigate disassembly from technical and operational standpoint that lack of strategic perspective. This paper attempts to fill this gap by looking at disassembly from a strategic perspective by considering organisational characteristics, process choices and product attributes. To be more specific, this paper has three objectives. First, to gain understanding what has been done, and what need to be done in the field of disassembly in remanufacturing. Second, to conduct a systematic literature review for identifying the factors affecting disassembly for remanufacturing. Third, to propose a new model of disassembly for remanufacturing and also to provide avenues for future research. Design/methodology/approach: This study used a systematic literature review method. A series of steps were undertaken during the review. The study was started with determining the purpose of the study, selecting appropriate keywords, and reducing the selected papers using a number of criteria. A deeper analysis was carried out on the final paper that meets the criteria for this review. Findings: There are two main findings of this study. First, a list of factors affecting disassembly in remanufacturing is identified. The factors can be categorised into three groups: organisational factors, process choices and product attributes. Second, using factors that have been identified, a new model of disassembly process for remanufacturing is developed. Current studies only consider disassembly as a physical activity to break down products into components. In the new model, disassembly is viewed as a process that converts into into output, which consist of a series of steps. Research limitations/implications:  The opportunities for future research include: the need to develop an index of factors affecting disassembly, and how to most appropriate relationship between original equipment manufacturers and contract remanufacturers to share knowledge gained from remanufacturing operations to improve product remanufacturability. Practical implications: Remanufacturers should not focus on product attributes only in order to manage their disassembly process efficiently. Rather, more strategic factors such organisational factors and process choices should also be considered as well. Originality/value:  This is the first study that identifies a comprehensive factors affecting disassembly in remanufacturing. In addition, it is for the first time that disassembly is not only viewed as a physical activity, but it is a process that consists of a series of step.

[1]  Winifred Ijomah,et al.  Application of active disassembly to extend profitable remanufacturing in small electrical and electronic products , 2010 .

[2]  Mohamad Y. Jaber,et al.  An economic production and remanufacturing model with learning effects , 2011 .

[3]  Bert Bras,et al.  Issues in the Automotive Parts Remanufacturing Industry - A Discussion of Results from Surveys Performed among Remanufacturers , 1998 .

[4]  Barbara B. Flynn,et al.  Empirical research methods in operations management , 1990 .

[5]  Erik Sundin,et al.  Exploring inter-organizational relationships in automotive component remanufacturing , 2014 .

[6]  D. C. Whybark,et al.  From garbage to goods: Successful remanufacturing systems and skills , 2000 .

[7]  Ian M. Langella Heuristics for demand-driven disassembly planning , 2007, Comput. Oper. Res..

[8]  R. G. Fenton,et al.  Analysis of Remanufacturer Waste Streams Across Product Sectors , 2001 .

[9]  Muris Lage Junior,et al.  Production planning and control for remanufacturing: literature review and analysis , 2012 .

[10]  Surendra M. Gupta,et al.  Performance improvement potential of sensor embedded products in environmental supply chains , 2011 .

[11]  Geraldo Ferrer,et al.  MATERIAL PLANNING FOR A REMANUFACTURING FACILITY , 2001 .

[12]  K. Peattie,et al.  Meeting the Closed-Loop Challenge: The Case of Remanufacturing , 2004 .

[13]  Gilvan C. Souza,et al.  MIXED ASSEMBLY AND DISASSEMBLY OPERATIONS FOR REMANUFACTURING , 2003 .

[14]  Geraldo Ferrer Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..

[15]  Michael E. Ketzenberg,et al.  Value of Information in Closed Loop Supply Chains , 2006 .

[16]  Hwa-Cho Yi,et al.  A study on the method of disassembly time evaluation of a product using work factor method , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).

[17]  Carsten Franke,et al.  Remanufacturing of mobile phones—capacity, program and facility adaptation planning , 2006 .

[18]  Vaidyanathan Jayaraman,et al.  Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach , 2006 .

[19]  Yanbin Du,et al.  An integrated method for evaluating the remanufacturability of used machine tool , 2012 .

[20]  Anil Mital,et al.  Incorporating work factors in design for disassembly in product design , 2005 .

[21]  R. W. Grubbström,et al.  Planned lead time determination in a make-to-order remanufacturing system , 2007 .

[22]  Abe Zeid,et al.  Pricing decisions in a multi-criteria setting for product recovery facilities , 2011 .

[23]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[24]  W. L. Ijomah A tool to improve training and operational effectiveness in remanufacturing , 2008, Int. J. Comput. Integr. Manuf..

[25]  Zhenqi Zhu,et al.  The challenges and Importance of Knowledge Management in Remanufacturing , 2008 .

[26]  W. C. Benton,et al.  Supply-Chain Management for Recoverable Manufacturing Systems , 2000, Interfaces.

[27]  Askiner Güngör Evaluation of connection types in design for disassembly (DFD) using analytic network process , 2006, Comput. Ind. Eng..

[28]  Surendra M. Gupta,et al.  Near optimal buffer allocation in remanufacturing systems with N-policy , 2010, Comput. Ind. Eng..

[29]  Chris Ryan,et al.  Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Australia , 2001 .

[30]  MengChu Zhou,et al.  Disassembly modeling, planning, and application , 2002 .

[31]  Wei-Chang Yeh,et al.  Simplified swarm optimization in disassembly sequencing problems with learning effects , 2012, Comput. Oper. Res..

[32]  Winifred Ijomah,et al.  Addressing decision making for remanufacturing operations and design-for-remanufacture , 2009 .

[33]  Surendra M. Gupta,et al.  Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..

[34]  V. Daniel R. Guide,et al.  Supply Chain Sourcing in Remanufacturing Operations: An Empirical Investigation of Remake Versus Buy , 2010, Decis. Sci..

[35]  Olga Battaïa,et al.  A decision support system to manage the quality of End-of-Life products in disassembly systems , 2016 .

[36]  S. G. Li,et al.  The research of online price quotation for the automobile parts exchange programme , 2009, Int. J. Comput. Integr. Manuf..

[37]  Christos Zikopoulos,et al.  On the attractiveness of sorting before disassembly in remanufacturing , 2008 .

[38]  Cheng-Han Wu OEM product design in a price competition with remanufactured product , 2013 .

[39]  A. Lambert Determining optimum disassembly sequences in electronic equipment , 2002 .

[40]  D. Huisingh,et al.  Remanufacturing for the automotive aftermarket-strategic factors: literature review and future research needs , 2009 .

[41]  Marco Santochi,et al.  Computer Aided Disassembly Planning: State of the Art and Perspectives , 2002 .

[42]  D. Tranfield,et al.  Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .

[43]  Bert Bras,et al.  Product, process, and organizational design for remanufacture – an overview of research , 1999 .

[44]  Kenichi Nakashima,et al.  Enhancing value in reverse supply chains by sorting before product recovery , 2012 .

[45]  Helmut Bley,et al.  Appropriate Human Involvement in Assembly and Disassembly , 2004 .

[46]  J. D. Chiodo,et al.  Use of active disassembly technology to improve remanufacturing productivity: automotive application , 2014, Int. J. Comput. Integr. Manuf..

[47]  M. Eugene Merchant,et al.  A WEB-BASED SYSTEM FOR REVERSE MANUFACTURING AND PRODUCT ENVIRONMENTAL IMPACT ASSESSMENT CONSIDERING END-OF-LIFE DISPOSITIONS , 2004 .

[48]  Karl Inderfurth,et al.  How Yield Process Misspecification Affects the Solution of Disassemble-to-order Problems , 2015 .

[49]  Christos Zikopoulos,et al.  Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites , 2008 .

[50]  Fabrice Mathieux,et al.  ReSICLED: a new Recovery Conscious Design method for complex products based on a multicriteria assessment of the recoverability. , 2008 .

[51]  Shana Smith,et al.  Rule-based recursive selective disassembly sequence planning for green design , 2011, Adv. Eng. Informatics.

[52]  Surendra M. Gupta,et al.  Disassembly to order system under uncertainty , 2006 .

[53]  Surendra M. Gupta,et al.  Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..

[54]  Nam Wook Cho,et al.  A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations , 2010 .

[55]  E. Sundin,et al.  Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .

[56]  Wolfgang Grimm,et al.  Reuse of Electric Motors in Consumer Products , 1998 .

[57]  Winifred Louissa Ijomah,et al.  A MODEL-BASED DEFINITION OF THE GENERIC REMANUFACTURING BUSINESS PROCESS , 2002 .

[58]  Rizauddin Ramli,et al.  Disassemblability of end-of-life vehicle: a critical review of evaluation methods , 2011 .

[59]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[60]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[61]  Myer Kutz,et al.  Environmentally conscious mechanical design , 2007 .

[62]  Aldo Roberto Ometto,et al.  Ecodesign methods focused on remanufacturing , 2010 .

[63]  Surendra M. Gupta,et al.  Disassembly sequence planning for products with defective parts in product recovery , 1998 .

[64]  Gregory C. Smith,et al.  Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning , 2012, Adv. Eng. Informatics.

[65]  Erik Sundin,et al.  Design for automatic end‐of‐life processes , 2012 .

[66]  Winifred Ijomah,et al.  Remanufacturing: a key strategy for sustainable development , 2004 .

[67]  Surendra M. Gupta,et al.  A path-relinking approach for a bi-criteria disassembly sequencing problem , 2008, Comput. Oper. Res..

[68]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[69]  Peggy Zwolinski,et al.  A tool to implement sustainable end-of-life strategies in the product development phase , 2005 .

[70]  Ajd Fred Lambert,et al.  Disassembly sequencing: A survey , 2003 .

[71]  John S. Usher,et al.  Production planning for remanufactured products , 2007 .

[72]  Peggy Zwolinski,et al.  Remanufacturing strategies to support product design and redesign , 2008 .

[73]  Ali Mousavi,et al.  A computer-based product classification and component detection for demanufacturing processes , 2011, Int. J. Comput. Integr. Manuf..

[74]  Geraldo Ferrer,et al.  Value of information in remanufacturing complex products , 2004 .

[75]  Ulrich Nissen A methodology for the development of cleaner products , 1995 .

[76]  Chettiyappan Visvanathan,et al.  Resources, Conservation and Recycling , 2011 .

[77]  Bert Bras Design for Remanufacturing Processes , 2015 .

[78]  R. G. Fenton,et al.  Supporting Design for Remanufacture through Waste-Stream Analysis of Automotive Remanufacturers , 2000 .

[79]  Cheng-Han Wu,et al.  Product-design and pricing strategies with remanufacturing , 2012, Eur. J. Oper. Res..

[80]  Spyros Reveliotis,et al.  Uncertainty management in optimal disassembly planning through learning-based strategies , 2007 .

[81]  O. Tang,et al.  The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufacturing system , 2004 .

[82]  Guangdong Tian,et al.  Energy evaluation method and its optimization models for process planning with stochastic characteristics: A case study in disassembly decision-making , 2012, Comput. Ind. Eng..

[83]  E. Sundin,et al.  Managing the Remanufacturing Organization for an Optimal Product Life Cycle , 2005, 2005 4th International Symposium on Environmentally Conscious Design and Inverse Manufacturing.

[84]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .

[85]  Geraldo Ferrer On the widget remanufacturing operation , 2001, Eur. J. Oper. Res..

[86]  Johan Östlin,et al.  Importance of closed-loop supply chain relationships for product remanufacturing , 2008 .

[87]  Anil Mital,et al.  Evaluation of disassemblability to enable design for disassembly in mass production , 2003 .

[88]  James F. C. Windmill,et al.  Design for remanufacture: a literature review and future research needs , 2011 .

[89]  Carsten Franke,et al.  Process and Facility Planning for Mobile Phone Remanufacturing , 2004 .

[90]  Hak-Soo Mok,et al.  Disassemblability of Mechanical Parts in Automobile for Recycling of Materials , 1996 .

[91]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[92]  David W. Rosen,et al.  A virtual prototyping approach to product disassembly reasoning , 1997, Comput. Aided Des..

[93]  L. H. Shu,et al.  Application of a design-for-remanufacture framework to the selection of product life-cycle fastening and joining methods , 1999 .

[94]  E. Westkämper,et al.  Assembly and Disassembly Processes in Product Life Cycle Perspectives , 2003 .

[95]  A. R. Ometto,et al.  Remanufacturing in Brazil: case studies on the automotive sector , 2013 .

[96]  Geoffrey P. Hammond,et al.  Development of robust design-for-remanufacturing guidelines to further the aims of sustainable development , 2007 .

[97]  Hui-Ming Wee,et al.  Green-product-design value and information-technology investment on replenishment model with remanufacturing , 2010, Int. J. Comput. Integr. Manuf..