Development of Project Level Engineering Productivity Benchmarking Index
暂无分享,去创建一个
Stephen P. Mulva | William J. O'Brien | Stephen R. Thomas | Pin Chao Liao | William J. O’Brien | Jiukun Dai | S. R. Thomas | Pin-Chao Liao | Jiukun Dai
[1] A. Agresti,et al. Statistical Methods for the Social Sciences , 1979 .
[2] William F. Maloney,et al. Job Characteristics: Union-Nonunion Differences , 1995 .
[3] William Ibbs,et al. Impact of Change's Timing on Labor Productivity , 2005 .
[4] Simaan M. AbouRizk,et al. Measuring and Estimating Steel Drafting Productivity , 2003 .
[5] Rafael Sacks,et al. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .
[6] C Zener,et al. Analysis of scientific productivity. , 1968, Science.
[7] M. Kevin Parfitt,et al. Conceptual Model for Measuring Productivity of Design and Engineering , 1999 .
[8] Inho Kim. Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking , 2007 .
[9] Ralph D. Ellis,et al. Measuring Project Level Productivity on Transportation Projects , 2006 .