Reliability analysis of a rubble mound breakwater using the theory of fuzzy random variables
暂无分享,去创建一个
[1] Matthias Stein,et al. Fuzzy logic based approach to FRP retrofit of columns , 2007 .
[2] Mehmet Levent Koç,et al. Risk assessment of a vertical breakwater using possibility and evidence theories , 2009 .
[3] Can Elmar Balas,et al. A Sensitivity Study for the Second Order Reliability-Based Design Model of Rubble Mound Breakwaters , 2000 .
[4] Huibert Kwakernaak,et al. Fuzzy random variables - I. definitions and theorems , 1978, Inf. Sci..
[5] Elmar,et al. Risk Assessment of Vertical Breakwaters -- A Case Study in Turkey , 2002 .
[6] James L. Beck,et al. Life-cycle cost optimal design of passive dissipative devices , 2009 .
[7] Uwe Reuter,et al. Prediction of uncertain structural responses using fuzzy time series , 2008 .
[8] John Dalsgaard Sørensen,et al. Reliability Analysis of Geotechnical Failure Modes for Vertical Wall Breakwaters , 2000 .
[9] M. Beer,et al. Fuzzy Randomness: Uncertainty in Civil Engineering and Computational Mechanics , 2004 .
[10] Jim W. Hall,et al. RANDOM AND FUZZY SET RELIABILITY ANALYSIS OF COASTAL STRUCTURES , 2003 .
[11] Aysen Ergin,et al. Damage risk assessment of breakwaters under tsunami attack , 2006 .
[12] Didier Dubois,et al. Representing parametric probabilistic models tainted with imprecision , 2008, Fuzzy Sets Syst..
[13] Zdeněk Zmeškal. Value at risk methodology of international index portfolio under soft conditions (fuzzy-stochastic approach) , 2005 .
[14] Aysen Ergin,et al. Reliability-based risk assessment in coastal projects: Case study in Turkey , 2002 .
[15] W. Pedrycz. Why triangular membership functions , 1994 .
[16] Ching-Hsue Cheng,et al. A new approach for ranking fuzzy numbers by distance method , 1998, Fuzzy Sets Syst..
[17] Wolfgang Graf,et al. Time-dependent reliability of textile-strengthened RC structures under consideration of fuzzy randomness , 2006 .
[18] Volker Krätschmer,et al. A unified approach to fuzzy random variables , 2001, Fuzzy Sets Syst..
[19] Michael Beer. Model-free sampling , 2007 .
[20] Didier Dubois,et al. Joint Propagation and Exploitation of Probabilistic and Possibilistic Information in Risk Assessment , 2006, IEEE Transactions on Fuzzy Systems.
[21] M. Puri,et al. Fuzzy Random Variables , 1986 .
[22] M. Beer,et al. Engineering computation under uncertainty - Capabilities of non-traditional models , 2008 .
[23] Tapan Kumar Roy,et al. Multiobjective Transportation Model with Fuzzy Parameters: Priority based Fuzzy Goal Programming Approach , 2008 .
[24] Jim W. Hall,et al. Probabilistic condition characterisation of coastal structures using imprecise information , 2003 .
[25] Bernd Möller,et al. Safety assessment of structures in view of fuzzy randomness , 2003 .
[26] Yue Zhang,et al. The theory of fuzzy stochastic processes , 1992 .
[27] Debjani Chakraborty,et al. A production inventory model with fuzzy random demand and with flexibility and reliability considerations , 2009, Comput. Ind. Eng..
[28] W. Graf,et al. Fuzzy structural analysis using α-level optimization , 2000 .
[29] Andreas Hoffmann,et al. Analysis of textile-reinforced concrete structures under consideration of non-traditional uncertainty models , 2007 .
[30] John Dalsgaard Sørensen,et al. Reliability-Based Optimization in Structural Engineering , 1994 .
[31] Paul T. Boggs,et al. Sequential Quadratic Programming , 1995, Acta Numerica.
[32] Huibert Kwakernaak,et al. Fuzzy random variables--II. Algorithms and examples for the discrete case , 1979, Inf. Sci..
[33] Hsien-Chung Wu,et al. Bayesian system reliability assessment under fuzzy environments , 2004, Reliab. Eng. Syst. Saf..
[34] Yubin Liu,et al. Fuzzy random reliability of structures based on fuzzy random variables , 1997, Fuzzy Sets Syst..