Manufacturing industries integrate different resources in their production pipelines: material, personnel, machine tools, robots, etc. The resource management has to optimize production costs by taking into account on-line changes. The purpose of OPTAMS (optimized all monitor system) is to integrate an on-line optimization tool with a resource management system and a control system. OPTAMS allows to monitor the production process in order to run the re-optimization, if the preceding planning has to be retuned or updated. Thanks to the optimization, the company is able to increase the production efficiency. The optimization is based on Tabu search and the functional consists in several terms allowing finding a compromise from optimizing, costs, resource distribution workload, and time to delivering, delay, etc. The whole system's architecture is based on a distributed control system which integrates CANbus and Ethernet devices. OPTAMS has been realized as a European Commission R&D IST project, and has been validated at SHELBOX factory; the company produces mobile houses.
[1]
M. Sacramento Quintanilla,et al.
A tabu search approach to machine scheduling
,
1998,
Eur. J. Oper. Res..
[2]
Peter B. Luh,et al.
An effective approach for job-shop scheduling with uncertain processing requirements
,
1999,
IEEE Trans. Robotics Autom..
[3]
E. Nowicki,et al.
A fast tabu search algorithm for the permutation flow-shop problem
,
1996
.
[4]
Marie-Claude Portmann,et al.
Branch and bound crossed with GA to solve hybrid flowshops
,
1998,
Eur. J. Oper. Res..
[5]
Egon Balas,et al.
Job Shop Scheduling With Deadlines
,
1998,
J. Comb. Optim..
[6]
Fred W. Glover,et al.
A user's guide to tabu search
,
1993,
Ann. Oper. Res..
[7]
E. Nowicki,et al.
A Fast Taboo Search Algorithm for the Job Shop Problem
,
1996
.
[8]
M. G. A. Verhoeven,et al.
Tabu search for resource-constrained scheduling
,
1998,
Eur. J. Oper. Res..