Dynamic Site Layout Planning Using Approximate Dynamic Programming
暂无分享,去创建一个
[1] Warren B. Powell,et al. Approximate Dynamic Programming - Solving the Curses of Dimensionality , 2007 .
[2] Warren B. Powell,et al. Handbook of Learning and Approximate Dynamic Programming , 2006, IEEE Transactions on Automatic Control.
[3] Eric V. Denardo,et al. Dynamic Programming: Models and Applications , 2003 .
[4] Maged Georgy,et al. An automated system for dynamic construction site layout planning , 2003 .
[5] Khaled A El-Rayes,et al. Minimizing Construction-Related Hazards in Airport Expansion Projects , 2006 .
[6] Haidar M. Harmanani,et al. Genetic Algorithm for Solving Site Layout Problem with Unequal-Size and Constrained Facilities , 2002 .
[7] Sai On Cheung,et al. Site pre-cast yard layout arrangement through genetic algorithms , 2002 .
[8] Iris D. Tommelein,et al. Dynamic layout planning using a hybrid incremental solution method , 1999 .
[9] C. M. Tam,et al. Genetic Algorithm for Optimizing Supply Locations around Tower Crane , 2001 .
[10] Khaled A El-Rayes,et al. Trade-off between Safety and Cost in Planning Construction Site Layouts , 2005 .
[11] Aviad Shapira,et al. VR-based planning of construction site activities , 1999 .
[12] Saad H.S. Al-Jibouri,et al. GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING , 2002 .
[13] Arthur W. T. Leung,et al. Site layout planning using nonstructural fuzzy decision support system , 2002 .
[14] Nashwan Dawood,et al. Visualisation of a stockyard layout simulator “SimStock”: a case study in precast concrete products industry , 2003 .
[15] Warren B. Powell,et al. “Approximate dynamic programming: Solving the curses of dimensionality” by Warren B. Powell , 2007, Wiley Series in Probability and Statistics.
[16] Maged Georgy,et al. LAYOUT PLANNING OF CONSTRUCTION SITES CONSIDERING MULTIPLE OBJECTIVES: A GOAL- PROGRAMMING APPROACH , 2005 .
[17] Umberto Bertelè,et al. Nonserial Dynamic Programming , 1972 .
[18] Osama Moselhi,et al. Computer-aided site layout planning , 2006 .
[19] Jian-Ping Zhang,et al. Hybrid intelligence utilization for construction site layout , 2002 .
[20] Jian-Ping Zhang,et al. 4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .
[21] Jian-Ping Zhang,et al. Application of 4D for dynamic site layout and management of construction projects , 2005 .
[22] Tarek Hegazy,et al. DYNAMIC LAYOUT OF CONSTRUCTION TEMPORARY FACILITIES CONSIDERING SAFETY , 2004 .
[23] Dimitris Bertsimas,et al. An Approximate Dynamic Programming Approach to Multidimensional Knapsack Problems , 2002, Manag. Sci..
[24] Hesham Osman,et al. A hybrid CAD-based construction site layout planning system using genetic algorithms , 2003 .
[25] Tarek Hegazy,et al. EvoSite: Evolution-Based Model for Site Layout Planning , 1999 .
[26] Warren B. Powell,et al. Approximate dynamic programming for high dimensional resource allocation problems , 2005 .
[27] Kwok-Wing Chau,et al. A Knowledge-Based System for Construction Site Level Facilities Layout , 2002, IEA/AIE.
[28] Tarek Zayed,et al. Budget Allocation for Steel Bridge Paint Maintenance , 2004 .