Repairable inventory theory: Models and applications

[1]  D. Schrady A deterministic inventory model for reparable items , 1967 .

[2]  Stephen G. Allen,et al.  An Ordering Policy for Repairable Stock Items , 1968, Oper. Res..

[3]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[4]  Sheldon E. Haber,et al.  A DEMAND PREDICTION TECHNIQUE FOR ITEMS IN MILITARY INVENTORY SYSTEMS , 1969 .

[5]  Vincent P. Simpson An Ordering Model for Recoverable Stock Items , 1970 .

[6]  Richard M. Simon,et al.  Technical Note - Comments on a Paper by S. G. Allen and D. A. D'Esopo: "An Ordering Policy for Repairable Stock Items" , 1971, Oper. Res..

[7]  Craig C. Sherbrooke An Evaluator for the Number of Operationally Ready Aircraft in a Multilevel Supply System , 1971, Oper. Res..

[8]  R. M. Simon,et al.  Stationary Properties of a Two-Echelon Inventory Model for Low Demand Items , 1971, Oper. Res..

[9]  Edward A. Silver Inventory allocation among an assembly and its repairable subassemblies , 1972 .

[10]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[11]  Zachary F. Lansdowne,et al.  Optimal design of a multi‐item, multi‐location, multi‐repair type repair and supply system , 1974 .

[12]  Bruce L. Miller,et al.  Dispatching from Depot Repair in a Recoverable Item Inventory System: On the Optimality of a Heuristic Rule , 1974 .

[13]  Sheldon E. Haber,et al.  An Optimal Inventory Model for the Intermediate Echelon When Repair is Possible , 1975 .

[14]  Francis Russell Richards A Stochastic Model of a Repairable-Item Inventory System with Attrition and Random Lead Times , 1976, Oper. Res..

[15]  J. Muckstadt The Consolidated Support Model: A Three-Echelon, Multi-Item Model for Recoverable Items , 1976 .

[16]  Donald Gross,et al.  Queueing Models for Spares Provisioning. , 1977 .

[17]  John A. Muckstadt Some approximations in multi‐item, multi‐echelon inventory systems for recoverable items , 1978 .

[18]  Vincent P. Simpson Optimum Solution Structure for a Repairable Inventory Problem , 1978, Oper. Res..

[19]  Donald Gross,et al.  Spares Provisioning for Repairable Items: Cyclic Queues in Light Traffic. , 1978 .

[20]  Bruce L. Miller,et al.  The distribution of recoverable inventory items from a repair center when the number of consumption centers is large , 1978 .

[21]  Steven Nahmiasj,et al.  A deterministic model for a repairable item inventory system with a finite repair rate , 1979 .

[22]  J. D. Davidson Initial Provisioning Of Rotable Spares For Airlines: A Case Study , 1980 .

[23]  K. Shanker Exact analysis of a two-echelon inventory system for recoverable items under batch inspection policy , 1981 .

[24]  John A. Muckstadt,et al.  An analysis of single item inventory systems with returns , 1981 .

[25]  Gary D. Scudder,et al.  Spares stocking policies for repairable items with dependent repair times , 1982 .

[26]  Gary D. Scudder,et al.  Priority Scheduling Rules for Repairable Inventory Systems , 1982 .

[27]  Richard M. Soland,et al.  A Closed Queueing Network Model for Multi-Echelon Repairable Item Provisioning. , 1983 .

[28]  Margaret K. Schaefer A Multi-Item Maintenance Center Inventory Model for Low-Demand Reparable Items , 1983 .

[29]  Gary D. Scudder Priority Scheduling and Spares Stocking Policies for a Repair Shop: The Multiple Failure Case , 1984 .

[30]  J. V. Howard Service Exchange Systems — The Stock Control of Repairable Items , 1984 .

[31]  Donald Gross,et al.  Multiechelon repairable‐item provisioning in a time‐varying environment using the randomization technique , 1984 .

[32]  Margaret K. Schaefer,et al.  Optimal maintenance center inventories for fault-tolerant repairable systems , 1984 .

[33]  Khalil F. Matta,et al.  A simulation model for repairable items/spare parts inventory systems , 1985, Comput. Oper. Res..

[34]  Stephen C. Graves,et al.  A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .

[35]  Charles H. Smith,et al.  Optimal inventories for repairable redundant systems with aging components , 1985 .

[36]  Craig C. Sherbrooke,et al.  VARI-METRIC: Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models , 1986, Oper. Res..

[37]  J. J. Brennan,et al.  The performance of cannibalization policies in a maintenance system with spares, repair, and resource constraints , 1986 .

[38]  Donald Gross,et al.  Simulation Methodologies for Transient Markov Processes: A Comparative Study Based on Multi-Echelon Repairable Item Inventory Systems, , 1986 .

[39]  K. Moinzadeh,et al.  Batch size and stocking levels in multi-echelon repairable systems , 1986 .

[40]  Kamran Moinzadeh,et al.  Operating characteristics of a two‐echelon inventory system for repairable and consumable items under batch ordering and shipment policy , 1987 .

[41]  Donald Gross,et al.  Transient behavior of large Markovian multiechelon repairable item inventory systems using a truncated state space approach , 1987 .

[42]  Hau L. Lee A multi-echelon inventory model for repairable items with emergency lateral transshipments , 1987 .

[43]  Donald Gross,et al.  A network decomposition approach for approximating the steady-state behavior of Markovian multi-echelon reparable item inventory systems , 1987 .

[44]  Charles J. Malmborg,et al.  A Decision Support System to Evaluate Maintenance Requirements of Recoverable Item Populations , 1987, IEEE Transactions on Systems, Man, and Cybernetics.

[45]  Mk Schaefer Replenishment policies for inventories of recoverable items with attrition , 1989 .

[46]  S. Albright An approximation to the stationary distribution of a multiechelon repairable‐item inventory system with finite sources and repair channels , 1989 .

[47]  Richard M. Soland,et al.  Optimal Provisioning for Single-Echelon Repairable Item Inventory Control in a Time-Varying Environment , 1989 .

[48]  Mark J. Tedone Repairable Part Management , 1989 .

[49]  Kamran Moinzadeh,et al.  A repairable item inventory system with diagnostic and repair service , 1989 .

[50]  David F. Pyke Priority repair and dispatch policies for reparable-item logistics systems , 1990 .

[51]  Ludo Gelders,et al.  Repairable Item Inventory Systems: a literature review , 1990 .

[52]  I. F. A. S. Member Optimal Stock Levels and Service Channel Allocations in a Multi-Item Repairable Asset Inventory System , 1991 .

[53]  A. Kumar,et al.  A probabilistic model for a repairable mining equipment inventory system and procurement policy determination , 1991 .

[54]  Radivoj Petrovic,et al.  SPARTA II: Further development in an expert system for advising on stocks of spare parts , 1992 .

[55]  Ludo Gelders,et al.  EOQ type formulations for controlling repairable inventories , 1992 .

[56]  S. Albright,et al.  Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system , 1992 .

[57]  Mahmut Parlar,et al.  A comparison of allocation policies in a two-echelon repairable-item inventory model , 1993 .

[58]  Amit Gupta Approximate Solution of a Single-Base Multi-indentured Repairable-item Inventory System , 1993 .

[59]  Ki Ling Cheung,et al.  A Multiechelon Inventory Model with Multiple Failures , 1993 .

[60]  Jean-Marie Proth,et al.  Inventory control of repairable tools with incomplete information , 1993 .

[61]  Richard M. Soland,et al.  Iterative solution methods for obtaining the steady-state probability distributions of Markovian multi-echelon repairable item inventory systems , 1993, Comput. Oper. Res..

[62]  David M. Miller,et al.  Base stock level determination for high cost low demand critical repairable spares , 1994, Comput. Oper. Res..

[63]  J. Ashayeri,et al.  Inventory management of repairable service parts for personal computers : A case study , 1996 .

[64]  Prem Vrat,et al.  A simulation study of unit exchange spares management of diesel locomotives in the Indian railways , 1994 .

[65]  Ki Ling Cheung,et al.  Multiple failures in a multi-item spares inventory model , 1995 .

[66]  Jong Soo Kim,et al.  Optimal algorithm to determine the spare inventory level for a repairable-item inventory system , 1996, Comput. Oper. Res..