Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines
暂无分享,去创建一个
Panos M. Pardalos | Jun Pei | Xinbao Liu | Shaojun Lu | P. Pardalos | Xinbao Liu | Jun Pei | Shaojun Lu
[1] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[2] I. Osman,et al. Simulated annealing for permutation flow-shop scheduling , 1989 .
[3] Jatinder N. D. Gupta,et al. Flowshop scheduling with dominant machines , 1995, Comput. Oper. Res..
[4] E. Nowicki,et al. A fast tabu search algorithm for the permutation flow-shop problem , 1996 .
[5] Bertrand M. T. Lin,et al. A concise survey of scheduling with time-dependent processing times , 2004, Eur. J. Oper. Res..
[6] Bertrand M. T. Lin,et al. Two-machine flowshop scheduling with conditional deteriorating second operations , 2006, Int. Trans. Oper. Res..
[7] Tarek Y. ElMekkawy,et al. Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times , 2007 .
[8] Lin Lin,et al. Flow shop scheduling with effects of learning and deterioration , 2008 .
[9] Christos Koulamas,et al. Single-machine scheduling problems with past-sequence-dependent setup times , 2008, Eur. J. Oper. Res..
[10] Yu-Hsiang Chung,et al. Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates , 2009, Comput. Oper. Res..
[11] Ling Wang,et al. On three-machine flow shop scheduling with deteriorating jobs , 2010 .
[12] Ji-Bo Wang,et al. Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines , 2012 .
[13] Chung-Cheng Lu,et al. Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups , 2012 .
[14] Shih-Wei Lin,et al. Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times , 2012 .
[15] Na Yi,et al. Scheduling two agents with sum-of-processing-times-based deterioration on a single machine , 2013, Appl. Math. Comput..
[16] Ji-Bo Wang,et al. Minimizing makespan in three-machine flow shops with deteriorating jobs , 2013, Comput. Oper. Res..
[17] Daniel Oron,et al. Scheduling controllable processing time jobs in a deteriorating environment , 2014, J. Oper. Res. Soc..
[18] Pandu R. Tadikamalla,et al. Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs , 2014, Eur. J. Oper. Res..
[19] Shanlin Yang,et al. Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan , 2015, Eur. J. Oper. Res..
[20] Shanlin Yang,et al. Single machine serial-batching scheduling with independent setup time and deteriorating job processing times , 2015, Optim. Lett..
[21] Pandu R. Tadikamalla,et al. Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time , 2015, J. Oper. Res. Soc..
[22] Yuan-Yuan Lu,et al. Research on no-idle permutation flowshop scheduling with time-dependent learning effect and deteriorating jobs , 2016 .
[23] Sigrid Knust,et al. Solution algorithms for synchronous flow shop problems with two dominating machines , 2016, Comput. Oper. Res..
[24] Hong-Sen Yan,et al. A scheduling procedure for a flow shop–like knowledgeable manufacturing cell with self-evolutionary features , 2016 .
[25] P. Pardalos,et al. Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times , 2017, Ann. Oper. Res..
[26] Shanlin Yang,et al. Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine , 2017, J. Glob. Optim..
[27] Joseph Y.-T. Leung,et al. Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine , 2017, Eur. J. Oper. Res..
[28] T.C.E. Cheng,et al. Parallel-machine scheduling of deteriorating jobs with potential machine disruptions ☆ , 2017 .
[29] Ting Qu,et al. Total completion time minimization for scheduling of two-machine flow shop with deterioration jobs and setup time , 2017 .
[30] Xinju Zhang. Multi-state System Reliability Analysis Based on Fuzzy Colored Petri Nets , 2018, Comput. J..
[31] Panos M. Pardalos,et al. Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning , 2018, J. Glob. Optim..
[32] Lin Li,et al. Machine Scheduling with Deteriorating Jobs and Modifying Maintenance Activities , 2018, Comput. J..
[33] Panos M. Pardalos,et al. A hybrid VNS-HS algorithm for a supply chain scheduling problem with deteriorating jobs , 2018, Int. J. Prod. Res..
[34] Panos M. Pardalos,et al. A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers , 2017, Omega.