A two-stage stochastic model for open pit mine planning under geological uncertainty

[15] R. Dimitrakopoulos, C.T. Farrelly, and M. Godoy, Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design, Mining Technology 111 (2002), pp. 82-88. [16] X. Emery, J.M. Ortiz, and J.J. Rodríguez, Quantifying uncertainty in mineral resources by use of classification schemes and conditional simulations, Mathematical geology 38 (2006), pp. 445-464. [17] R. Dimitrakopoulos, and M. Godoy, Grade control based on economic ore/waste classification functions and stochastic simulations: examples, comparisons and applications, Mining Technology 123 (2014), pp. 90-106. [18] J.M. Ortiz, and X. Emery, Geostatistical estimation of mineral resources with soft geological boundaries: a comparative study, Journal of the Southern African Institute of Mining and Metallurgy 106 (2006), pp. 577-584. [19] S. Ramazan, and R. Dimitrakopoulos, Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation, Orebody Modelling and Strategic Mine Planning, Spectrum Series 14 (2007), pp. 359-365. [20] F.R. Albor Consuegra, and R. Dimitrakopoulos, Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis, Mining Technology 118 (2009), pp. 79-90. [21] N. Boland, I. Dumitrescu, and G. Froyland, A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology, Optimization Online (2008). [22] R. Dimitrakopoulos, and S. Ramazan, Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutions, Mining Technology 117 (2008), pp. 155-160. [23] R. Dimitrakopoulos, Stochastic optimization for strategic mine planning: A decade of developments, Journal of Mining Science 47 (2011), pp. 138-150. [24] B. Groeneveld, and E. Topal, Flexible open-pit mine design under uncertainty, Journal of Mining Science 47 (2011), pp. 212-226. [25] A. Lamghari, and R. Dimitrakopoulos, A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty, European Journal of Operational Research 222 (2012), pp. 642-652. [26] S. Ramazan, and R. Dimitrakopoulos, Production scheduling with uncertain supply: a new solution to the open pit mining problem, Optimization and Engineering 14 (2012), pp. 361-380. [27] A. Leite, and R. Dimitrakopoulos, Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit, Mining Technology 116 (2013), pp. 109-118. [28] Application of particle swarm optimization to the open pit mine scheduling problem, Springer. [29] M.S. Shishvan, and J. Sattarvand, Long term production planning of open pit mines by ant colony optimization, European Journal of Operational Research 240 (2015), pp. 825-836. [30] R.C. Goodfellow, and R. Dimitrakopoulos, Global optimization of open pit mining complexes with uncertainty, Applied Soft Computing 40 (2016), pp. 292-304. [31] R. Goodfellow, F.A. Consuegra, R. Dimitrakopoulos, and T. Lloyd, Quantifying multi-element and volumetric uncertainty, Coleman McCreedy deposit, Ontario, Canada, Computers & Geosciences 42 (2012), pp. 71-78. [32] M. Srivastava, Iterative methods for spatial simulation, SCRF Annual Meeting Report 5, Stanford Center for Reservoir Forecasting, Stanford, CA 94305-2220, May 1992. (1992). [33] F.B. Guardiano, and R.M. Srivastava, Multivariate Geostatistics: Beyond Bivariate Moments, in Geostatistics Tróia ’92: Volume 1, A. Soares ed., Springer Netherlands, Dordrecht, 1993, pp. 133-144. [34] A. Boucher, J.F. Costa, L.G. Rasera, and E. Motta, Simulation of Geological Contacts from Interpreted Geological Model Using Multiple-Point Statistics, Mathematical Geosciences 46 (2014), pp. 561-572. [35] S. Strebelle, Conditional Simulation of Complex Geological Structures Using Multiple-Point Statistics, Mathematical Geology 34 (2002), pp. 1-21. [36] Y. Liu, Using the Snesim program for multiple-point statistical simulation, Computers & Geosciences 32 (2006), pp. 1544-1563. [37] C.V. Deutsch, and A.G. Journel, GSLIB: Geostatistical software library: Oxford University Press, New York (1998). [38] M.J. Pyrcz, and C.V. Deutsch, Geostatistical reservoir modeling, Oxford university press, 2014. A two-stage stochastic model for open pit mine planning under geological uncertainty

[1]  Alexandra M. Newman,et al.  A Review of Operations Research in Mine Planning , 2010, Interfaces.

[2]  Amina Lamghari,et al.  A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty , 2014, J. Oper. Res. Soc..

[3]  Alexandra M. Newman,et al.  Linear models for stockpiling in open-pit mine production scheduling problems , 2017, Eur. J. Oper. Res..

[4]  Amina Lamghari,et al.  A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..

[5]  R. Dimitrakopoulos,et al.  Incorporating geological and market uncertainties and operational flexibility into open pit mine design , 2011 .

[6]  Alexander Shapiro,et al.  The Sample Average Approximation Method for Stochastic Discrete Optimization , 2002, SIAM J. Optim..

[7]  Daniel Espinoza,et al.  PIT MINE SCHEDULING UNDER UNCERTAINTY : A ROBUST APPROACH , 2013 .

[8]  Salih Ramazan,et al.  Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability , 2004 .

[9]  Christian Lantuéjoul,et al.  TBSIM: A computer program for conditional simulation of three-dimensional Gaussian random fields via the turning bands method , 2006, Comput. Geosci..

[10]  Laureano F. Escudero,et al.  Medium range optimization of copper extraction planning under uncertainty in future copper prices , 2014, Eur. J. Oper. Res..

[11]  I. Dumitrescu,et al.  A Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology , 2008 .

[12]  J. Gholamnejad,et al.  Using chance constrained binary integer programming in optimising long term production scheduling for open pit mine design , 2007 .

[13]  Maurice Queyranne,et al.  A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project scheduling , 2016, Comput. Optim. Appl..