Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy

Abstract This paper is concerned with the joint determination of both economic production quantity and preventive maintenance (PM) schedules under the realistic assumption that the production facility is subject to random failure and the maintenance is imperfect. The manufacturing system is assumed to deteriorate while in operation, with an increasing failure rate. The system undergoes PM either upon failure or after having reached a predetermined age, whichever of them occurs first. As is often the case in real manufacturing applications, maintenance activities are imperfect and unable to restore the system to its original healthy state. In this work, we propose a model that could be used to determine the optimal number of production runs and the sequence of PM schedules that minimizes the long-term average cost. Some useful properties of the cost function are developed to characterize the optimal policy. An algorithm is also proposed to find the optimal solutions to the problem at hand. Numerical results are provided to illustrate both the use of the algorithm in the study of the optimal cost function and the latter’s sensitivity to different changes in cost factors.

[1]  El Houssaine Aghezzaf,et al.  An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..

[2]  Mohamed Ben-Daya,et al.  Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .

[3]  Mandyam M. Srinivasan,et al.  A Production/Inventory Policy for an Unreliable Machine , 2001 .

[4]  D. N. Prabhakar Murthy,et al.  Optimal Preventive Maintenance Policies for Repairable Systems , 1981, Oper. Res..

[5]  Kin Keung Lai,et al.  Practices of preventive maintenance and replacement for engines: A case study , 2000, Eur. J. Oper. Res..

[6]  Mohamed Ben-Daya,et al.  The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .

[7]  Ming J. Zuo,et al.  General sequential imperfect preventive maintenance models , 2000 .

[8]  Ming J. Zuo,et al.  Sequential imperfect preventive maintenance models with two categories of failure modes , 2001 .

[9]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[10]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[11]  W. Lovering Preventive maintenance. , 1951, Modern hospital.

[13]  Tadashi Dohi,et al.  Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment , 2001 .

[14]  Hady Elias Remeily Production lot sizing with Poisson machine breakdowns and general repair times - by Hady Elias Remeily , 1994 .

[15]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[16]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[17]  Sami El-Ferik,et al.  Age-based hybrid model for imperfect preventive maintenance , 2006 .

[18]  Mark Waters,et al.  A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling , 2006 .

[19]  Meir J. Rosenblatt,et al.  A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .

[20]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[21]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .