Multi-Objective Flexible Job-Shop Scheduling Problem in Steel Tubes Production
暂无分享,去创建一个
Lin Li | Jia-zhen Huo | Jia-zhen Huo | Lin Li
[1] Soo Y. Chang,et al. A lot grouping algorithm for a continuous slab caster in an integrated steel mill , 2000 .
[2] Huo Jia-zhen. A Heuristic Algorithm for Steel Pipes Production Scheduling , 2008 .
[3] Pierre Borne,et al. Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic , 2002, Math. Comput. Simul..
[4] F. Pezzella,et al. A genetic algorithm for the Flexible Job-shop Scheduling Problem , 2008, Comput. Oper. Res..
[5] Zhai Ying-ni. Survey on Multi-objective Flexible Job Shop Scheduling Problem , 2007 .
[6] Wu Zhi-ming. Hybrid particle swarm optimization approach for multi-objective flexible job-shop scheduling problems , 2005 .
[7] Simone Zanoni,et al. Model and analysis of integrated production-inventory system: The case of steel production , 2005 .
[8] Tang Li-xin,et al. Model and algorithm for hot rolling steel tube MPS , 2005 .
[9] Pan Xuejun. Integrated method of steel-making and continuous casting planning , 2007 .
[10] Li Jian-xiang. No-wait Parallel Flowshop Scheduling with Transfer and Setup Times , 2006 .
[11] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[12] Wang Meng-guang. Research on Hot Rolling Seamless Steel Tube Production Scheduling , 2003 .
[13] Lixin Tang,et al. A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex , 2007, Eur. J. Oper. Res..
[14] Zhen Gao,et al. An Optimization Model for the Production Planning of Overall Refinery * * Supported by the National , 2008 .
[15] Lixin Tang,et al. A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..
[16] Andreas Witt,et al. Simple heuristics for scheduling with limited intermediate storage , 2007, Comput. Oper. Res..