HIGH VOLUME/HIGH SPEED ASPHALT ROADWAY PREVENTIVE MAINTENANCE SURFACE TREATMENTS
暂无分享,去创建一个
David G Peshkin | M Wade | R DeSombre | M. Wade | D. Peshkin | R. Desombre
[1] J Samanos,et al. NEW TYPE OF ULTRATHIN FRICTION COURSE , 1991 .
[2] D W Janisch,et al. MINNESOTA SEAL COAT HANDBOOK , 1998 .
[3] Cindy K Estakhri,et al. EVALUATION OF ULTRATHIN FRICTION COURSE , 1994 .
[4] Scott Shuler. HIGH-TRAFFIC CHIP-SEAL CONSTRUCTION: THE TULSA TEST ROAD , 1991 .
[5] Michael S Mamlouk,et al. Pavement Maintenance Effectiveness: Preventive Maintenance Treatments: Instructor's Guide , 1996 .
[6] Rajib B. Mallick,et al. Open Graded Asphalt Friction Course: State of the Practice , 1998 .
[7] Scott Shuler. Design and Construction of Chip Seals for High Traffic Volume , 1998 .
[8] C Dwight Hixon,et al. NINE YEARS OF MICROSURFACING IN OKLAHOMA , 1993 .
[9] James S. Moulthrop,et al. Selecting a Preventive Maintenance Treatment for Flexible Pavements , 1999 .
[10] H Raza,et al. STATE-OF-THE-PRACTICE DESIGN, CONSTRUCTION, AND PERFORMANCE OF MICRO-SURFACING. FINAL REPORT , 1994 .
[11] Prithvi S. Kandhal. SIMPLIFIED DESIGN APPROACH TO SURFACE TREATMENTS FOR LOW-VOLUME ROADS , 1983 .
[12] D A Morian,et al. PAVEMENT TREATMENT EFFECTIVENESS, 1995 SPS-3 AND SPS-4 SITE EVALUATIONS, NATIONAL REPORT , 1997 .
[13] T S Rutkowski. EVALUATION OF SEAL COATS AS A PREVENTIVE MAINTENANCE TACTIC FOR PREMATURE DISTRESS IN ASPHALTIC PAVEMENTS. FINAL REPORT , 1995 .
[14] Joe P. Mahoney,et al. WASHINGTON STATE CHIP SEAL STUDY , 1990 .
[15] J. Landes. Application of a J-Q Model for Fracture in the Ductile-Brittle Transition , 1997 .
[16] H A Smith. PERFORMANCE CHARACTERISTICS OF OPEN-GRADED FRICTION COURSES , 1992 .
[17] Guk-Rwang Won. American Society for Testing and Materials , 1987 .
[18] Prithvi S. Kandhal,et al. Hot Mix Asphalt Materials, Mixture Design and Construction , 1996 .
[19] P S Kandhal,et al. CRITERIA FOR ACCEPTING PRECOATED AGGREGATES FOR SEAL COATS AND SURFACE TREATMENTS , 1987 .
[20] Mary Stroup-Gardiner,et al. Flexible Pavement Rehabilitation and Maintenance , 1998 .
[21] M Acott. THIN HOT MIX ASPHALT SURFACINGS , 1991 .
[22] Christine M Reed. SEVEN-YEAR PERFORMANCE EVALUATION OF SINGLE PASS, THIN LIFT BITUMINOUS CONCRETE OVERLAYS , 1994 .
[23] D A Morian,et al. MAINTAINING FLEXIBLE PAVEMENTS - THE LONG TERM PAVEMENT PERFORMANCE EXPERIMENT SPS-3 5-YEAR DATA ANALYSIS , 1998 .
[24] W L Hindermann,et al. Asphalt in Pavement Maintenance , 1968 .
[25] W H Campen,et al. A GENERAL METHOD OF DESIGN FOR SEAL COATS AND SURFACE TREATMENTS , 1969 .
[26] James C Wambold,et al. USE OF SMOOTH-TREADED TEST TIRE IN EVALUATING SKID RESISTANCE , 1992 .
[27] D N Geoffroy. COST-EFFECTIVE PREVENTIVE PAVEMENT MAINTENANCE , 1996 .
[28] Prithvi S. Kandhal,et al. CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE , 1997 .
[29] R E Smith,et al. PAVEMENT PREVENTIVE MAINTENANCE EFFECTIVENESS , 1991 .
[30] J W Button,et al. PERFORMANCE EVALUATION OF NOVACHIP (TRADEMARK): ULTRATHIN FRICTION COURSE. FINAL REPORT , 1995 .
[31] Rajib B. Mallick,et al. Pavement recycling guidelines for state and local governments: Participant`s reference book. Final report, September 1995--December 1997 , 1997 .
[32] R G Hicks,et al. EVALUATION OF OPEN-GRADED ASPHALT CONCRETE MIXTURES USED IN OREGON , 1991 .
[33] K A Zimmerman. GUIDELINES FOR USING ECONOMIC FACTORS AND MAINTENANCE COSTS IN LIFE-CYCLE COST ANALYSIS , 1997 .
[34] G C Page. Open-graded friction courses: Florida's experience , 1993 .
[35] Dallas N. Little,et al. HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE , 1994 .
[36] M. Baucus. Transportation Research Board , 1982 .