Optimization-Based Available-To-Promise with Multi-Stage Resource Availability
暂无分享,去创建一个
[1] Paul H. Zipkin,et al. Customer-order information, leadtimes, and inventories , 1995 .
[2] L. Zurich,et al. Operations Research in Production Planning, Scheduling, and Inventory Control , 1974 .
[3] Gerald Sullivan,et al. PROFIT: Decision Technology for Supply Chain Management at IBM Microelectronics Division , 2005 .
[4] Wallace J. Hopp,et al. Due date setting with supply constraints in systems using MRP , 2001 .
[5] Wallace J. Hopp,et al. Quoting manufacturing due dates subject to a service level constraint , 2000 .
[6] Yeong-Dae Kim,et al. A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints , 2000, Eur. J. Oper. Res..
[7] Chien-Yu Chen,et al. Quantity and Due Date Quoting Available to Promise , 2001, Inf. Syst. Frontiers.
[8] M. S. Kaylen. Economic Logistics: The Optimization of Spatial and Sectoral Resource, Production, and Distribution Systems , 1991 .
[9] William L. Berry,et al. Manufacturing Planning and Control Systems , 1984 .
[10] M. Ball,et al. Available to Promise , 2004 .
[11] R.-K. Li,et al. Integrating order release control with due-date assignment rules , 1997 .
[12] W. Hopp,et al. Quoting Customer Lead Times , 1995 .
[13] Michael O. Ball,et al. Material compatibility constraints for make-to-order production planning , 2003, Oper. Res. Lett..
[14] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[15] Hau L. Lee,et al. The Evolution of Supply-Chain-Management Models and Practice at Hewlett-Packard , 1995 .
[16] David Letson,et al. Economic Logistics: The Optimization of Spatial and Sectoral Resource, Production, and Distribution Systems , 1992 .