Solving the machine-loading problem in a flexible manufacturing system using a combinatorial auction-based approach
暂无分享,去创建一个
[1] Kalyan Singhal. Integrating production decisions , 1978 .
[2] Joe H. Mize,et al. Scheduling and control of flexible manufacturing systems: a critical review , 1994 .
[3] Kathryn E. Stecke,et al. Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .
[4] Ronald G. Askin,et al. A multiobjective evaluation of flexible manufacturing system loading heuristics , 1990 .
[5] S. K. Mukhopadhyay,et al. A heuristic procedure for loading problems in flexible manufacturing systems , 1992 .
[6] Subhash C. Sarin,et al. The machine loading and tool allocation problem in a flexible manufacturing system , 1987 .
[7] Ming Liang,et al. An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems , 1993 .
[8] Andrew Kusiak. Loading models in flexible manufacturing systems , 1995 .
[9] James J. Solberg,et al. INTEGRATED SHOP FLOOR CONTROL USING AUTONOMOUS AGENTS , 1992 .
[10] Fong-Yuen Ding,et al. Heuristics for the FMS-loading and part-type-selection problems , 1993 .
[11] R. S. Lashkari,et al. A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modelling and computational experience , 1987 .
[12] Y.-D. Kim,et al. Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems , 1997 .
[13] S. Rassenti,et al. A Combinatorial Auction Mechanism for Airport Time Slot Allocation , 1982 .
[14] Leon F. McGinnis,et al. A large scale machine loading problem in flexible assembly , 1985 .
[15] Michael Jeng-Ping Shaw,et al. A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems , 1987 .
[16] Pradeep Kumar,et al. Joint consideration of grouping and loading problems in a flexible manufacturing system , 1990 .
[17] P. Cramton. The FCC Spectrum Auctions: An Early Assessment , 1997 .
[18] Ronald M. Harstad,et al. Computationally Manageable Combinational Auctions , 1998 .
[19] Kripa Shanker,et al. Some solution methodologies for loading problems in a flexible manufacturing system , 1989 .
[20] Yoav Shoham,et al. Taming the Computational Complexity of Combinatorial Auctions: Optimal and Approximate Approaches , 1999, IJCAI.
[21] Kathryn E. Stecke,et al. A Hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems , 1986 .
[22] Andrew Kusiak,et al. The part families problem in flexible manufacturing systems , 1985 .
[23] Andrew W. Shogan,et al. Modelling and solving an FMS part selection problem , 1989 .
[24] Sanjiv Sarin,et al. A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system , 1990 .
[25] Manoj Kumar Tiwari,et al. A heuristic solution approach to the machine loading problem of an FMS and its Petri net model , 1997 .
[26] R. McAfee,et al. Analyzing the Airwaves Auction , 1996 .
[27] K. Barber,et al. Expert simulation for on-line scheduling , 1989, WSC '89.
[28] J. Banks,et al. Allocating uncertain and unresponsive resources: an experimental approach. , 1989, The Rand journal of economics.
[29] Nicholas R. Jennings,et al. Agent-based meeting scheduling: a design and implementation , 1995 .
[30] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[31] Ming Liang,et al. Combined part selection, load sharing and machine loading problem in hybrid manufacturing systems , 1992 .
[32] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .