Optimization of precast production scheduling for rail track slab

Design, production and installation of track slabs are critical technologies of high-speed rail which has become an important trend of the transportation development across the world. This paper mainly investigates the scheduling arrangements and optimization of precast production of track slabs. A Flow-Shop Multi-Objective Optimization Scheduling Model (FSMSM) has been developed and solved by a Hybrid Genetic and Ant Colony Algorithm (HGACA). Comparisons among HGACA, single Genetic Algorithm, Ant Colony Algorithm and classical heuristic rules show that the HGACA could obtain better schedules for the model. By means of co-scheduling factory production and engineering construction, scientific and efficient precast production has been promoted and management ability of the industry has been enhanced. It may help manufacturers save enterprise resource, reduce labor consumption, decrease inventory costs, enhance production flexibility and improve enterprise's Level of Service.

[1]  Nashwan Dawood,et al.  A capacity planning model for precast concrete building products , 1993 .

[2]  Inyong Ham,et al.  A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .

[3]  Chandrasekharan Rajendran,et al.  Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs , 2004, Eur. J. Oper. Res..

[4]  Adil Baykasoglu,et al.  Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks , 2013, Appl. Soft Comput..

[5]  Weng Tat Chan,et al.  Constraint Programming Approach to Precast Production Scheduling , 2002 .

[6]  Mostafa Zandieh,et al.  A genetic algorithm for JIT single machine scheduling with preemption and machine idle time , 2011, Expert Syst. Appl..

[7]  Hao Hu,et al.  An application of genetic algorithms to precast production scheduling , 2001 .

[8]  Nashwan Dawood,et al.  Flowshop scheduling model for bespoke precast concrete production planning , 2005 .

[9]  Li Jian-jun Scheduling of hybrid flow shop for batch of plastic parts based on ant colony and genetic algorithm , 2013 .

[10]  George J. Ziverts,et al.  PRODUCTION PLANNING AND SCHEDULING FOR LONG LINE PRESTRESS PRODUCTS , 1976 .

[11]  H. Adeli,et al.  Integrated Genetic Algorithm for Optimization of Space Structures , 1993 .

[12]  Sou-Sen Leu,et al.  Ga-based resource-constrained flow-shop scheduling model for mixed precast production , 2002 .

[13]  David Arditi,et al.  Concurrent Construction Scheduling Simulation Algorithm , 2014, Comput. Aided Civ. Infrastructure Eng..