Semi-Ideal Bidding via a Fuzzy TOPSIS Project Evaluation Framework in Risky Environments

AbstractBlind involvement in aimless bids may result the loss of bidding bond expenditures, purchased bidding documents, the cost of human resources engaged in mark-up estimation, and detailed project investigation costs such as site visits. In this research, a risk based fuzzy TOPSIS framework is set up to evaluate and prioritize bidding opportunities. This may help contractors to assign their limited resources to near optimal selected projects. The risks inherent in the nature of every tender, makes systematic risk analysis a prerequisite for any construction company. Proposed framework considers key determining risk factors such as corporate considerations, tender environment, contractual issues, and project specific risks. The methodology implementation has been facilitated by developing a graphical user interface that accepts linguistic terms expressed by main decision groups. A case study demonstrates the applicability of the model.

[1]  Mahmoud A. Abo-Sinna,et al.  An interactive algorithm for large scale multiple objective programming problems with fuzzy parameters through TOPSIS approach , 2006, Appl. Math. Comput..

[2]  T. Chu Selecting Plant Location via a Fuzzy TOPSIS Approach , 2002 .

[3]  K. Nakamura Preference relations on a set of fuzzy utilities as a basis for decision making , 1986 .

[4]  İrfan Ertuğrul,et al.  Comparison of fuzzy AHP and fuzzy TOPSIS methods for facility location selection , 2008 .

[5]  Osama Moselhi,et al.  Project Selection Considering Risk , 1993 .

[6]  Seung Heon Han,et al.  Multicriteria Financial Portfolio Risk Management for International Projects , 2004 .

[7]  T. Chu,et al.  A Fuzzy TOPSIS Method for Robot Selection , 2003 .

[8]  Ching-Hsue Cheng,et al.  Fuzzy hierarchical TOPSIS for supplier selection , 2009, Appl. Soft Comput..

[9]  E. Lee,et al.  Comparison of fuzzy numbers based on the probability measure of fuzzy events , 1988 .

[10]  Scott Baker,et al.  Techniques for the analysis of risks in major projects , 1998, J. Oper. Res. Soc..

[11]  Ying-Ming Wang,et al.  Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment , 2006, Expert Syst. Appl..

[12]  R. Olsson Risk management in a multi‐project environment: An approach to manage portfolio risks , 2008 .

[13]  Chen-Tung Chen,et al.  Extensions of the TOPSIS for group decision-making under fuzzy environment , 2000, Fuzzy Sets Syst..

[14]  Seung Heon Han,et al.  Contractor’s Risk Attitudes in the Selection of International Construction Projects , 2005 .

[15]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[16]  David B. Ashley,et al.  Data-Driven Analysis of “Corporate Risk” Using Historical Cost-Control Data , 1998 .

[17]  Jamal Shahrabi,et al.  PROJECT SELECTION BY USING FUZZY AHP AND TOPSIS TECHNIQUE , 2007 .

[18]  Dong-Hyun Jee,et al.  A method for optimal material selection aided with decision making theory , 2000 .

[19]  Mohammad Izadikhah,et al.  Extension of the TOPSIS method for decision-making problems with fuzzy data , 2006, Appl. Math. Comput..

[20]  Cengiz Kahraman,et al.  Fuzzy Multi-Criteria Decision Making , 2008 .

[21]  Mehdi Ravanshadnia,et al.  Hybrid fuzzy MADM project-selection model for diversified construction companies , 2010 .

[22]  Irfan Ertugrul,et al.  Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods , 2009, Expert Syst. Appl..

[23]  Joseph H. M. Tah,et al.  A fuzzy approach to constuction project risk assessment and analysis: construction project risk management system , 2001 .

[24]  Ching-Lai Hwang,et al.  Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.

[25]  Seung Heon Han,et al.  Approaches for Making Risk-Based Go/No-Go Decision for International Projects , 2001 .

[26]  Robert L. K. Tiong,et al.  NPV-at-Risk Method in Infrastructure Project Investment Evaluation , 2000 .

[27]  Cengiz Kahraman,et al.  Fuzzy Multi-Criteria Decision Making: Theory and Applications with Recent Developments , 2008 .