Role of Inventory Buffers in Construction Labor Performance

Buffers of material stockpile (inventory) are formed at the work level in construction to help manage production. The size of material stockpiles often has an important bearing on construction project performance. In construction projects, where conditions are often uncertain and variable, some have suggested that buffers be sized and located according to the conditions. New management thinking like lean construction and theory of constraints suggests that the size of buffers needs to be managed carefully, because when oversized, buffers are wasteful, impede workflow, and hinder performance. Research has shown that project variability can be affected with the careful deployment of buffers but has not really evaluated the impact on construction labor performance. This paper reports an exploratory analysis of the relationship between inventory (buffers) and construction labor performance with data collected from three commercial projects in Brazil. In this study, the size of the buffer between rebar fabrication and installation in the construction of a structural system is compared to the labor performance of the fabrication and installation crews. The results show that some buffer helps achieve the best labor performance in the construction operations studied.

[1]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[2]  R. Kenley,et al.  Process Dynamics: Identifying a Strategy for the Deployment of Buffers in Building Projects , 1998 .

[3]  Ivica Završki,et al.  Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .

[4]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[5]  Greg Howell,et al.  Implementing Lean Construction: Stabilizing Work Flow , 1997 .

[6]  Iris D. Tommelein,et al.  Parade Game: Impact of Work Flow Variability on Succeeding Trade Performance , 1998 .

[7]  Gregory A. Howell,et al.  Interaction between subcycles: one key to improved methods , 1993 .

[8]  Iris D. Tommelein,et al.  Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .

[9]  H. Randolph Thomas,et al.  Impact of Material Management on Productivity—A Case Study , 1989 .

[10]  Gregory A. Howell,et al.  Toward construction JIT , 1997 .

[11]  Feniosky Peña-Mora,et al.  Reliability Buffering for Construction Projects , 2004 .

[12]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[13]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[14]  David R. Riley,et al.  Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .

[15]  Michael J Horman Process dynamics : buffer management in building project operations , 2000 .

[16]  Ray Wild,et al.  Production and Operations Management: Text and Cases , 1994 .

[17]  David R. Riley,et al.  Fundamental principles of site material management , 2005 .

[18]  H R Thomas SCHEDULE ACCELERATION, WORK FLOW, AND LABOR PRODUCTIVITY , 2000 .

[19]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .