A Model for the Multiperiod Multiobjective Power Generation Expansion Problem

A long-term multiobjective model for the power generation expansion planning of electric systems is described and evaluated in this paper. The model optimizes simultaneously multiple objectives (i.e., minimizes costs, environmental impact, imported fuel and fuel price risks) and decides the location of the planned generation units in a multiperiod planning horizon. Among the attributes considered in the model are the investment and operation cost of the units, the environmental impact, the amount of imported fuel, and the portfolio investment risk. The approach to solve this problem is based on multiobjective linear programming and the analytical hierarchy process. A case study from the Mexican Electric Power System is used to illustrate the proposed framework

[1]  J. Bloom Long-Range Generation Planning Using Decomposition and Probabilistic Simulation , 1982, IEEE Transactions on Power Apparatus and Systems.

[2]  T. D. Veselka,et al.  Incorporating environmental concerns into electric system expansion planning using a multi–criteria decision support system , 1999 .

[3]  A. Kellas The use of WASP model and the generation system development in Cyprus , 2000, 2000 10th Mediterranean Electrotechnical Conference. Information Technology and Electrotechnology for the Mediterranean Countries. Proceedings. MeleCon 2000 (Cat. No.00CH37099).

[4]  J. L. Ceciliano,et al.  Transmission network planning using evolutionary programming , 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406).

[5]  Gintautas Palubinskas K-means clustering algorithm using entropy , 1998, Remote Sensing.

[6]  Jeremy A. Bloom Long-Range Generation Planning Using Decomposition and Probabilistic Simulation , 1982 .

[7]  Carlos E. Escobar-Toledo Increasing the Eco-Efficiency and Economy of an Energy System: A Multiobjective Optimization Approach , 2003 .

[8]  C. Hwang Multiple Objective Decision Making - Methods and Applications: A State-of-the-Art Survey , 1979 .

[9]  N. I. Voropai,et al.  Multi-criteria decision analysis techniques in electric power system expansion planning , 2002 .

[10]  S. Frant,et al.  Methodology of power generation system planning: multicriteria optimization accounting for uncertainty factors , 1996, Proceedings of 19th Convention of Electrical and Electronics Engineers in Israel.

[11]  A. Gomes Martins,et al.  A multiple objective mixed integer linear programming model for power generation expansion planning , 2004 .

[12]  Fu Qiang,et al.  MOPCA: a multi-criteria decision model for power system expansion planning - methodology and case study , 1999 .

[13]  F. Menz Green electricity policies in the United States : case study , 2005 .

[14]  Benjamin F. Hobbs,et al.  Optimization methods for electric utility resource planning , 1995 .

[15]  A. G. Kagiannas,et al.  Power generation planning: a survey from monopoly to competition , 2004 .

[16]  Unfccc Kyoto Protocol to the United Nations Framework Convention on Climate Change , 1997 .

[17]  João C. N. Clímaco,et al.  A multiple objective linear programming model for power generation expansion planning , 1995 .

[18]  Young-Chang Kim,et al.  Multicriteria generation-expansion planning with global environmental considerations , 1993 .

[19]  Thomas L. Morin,et al.  Multiobjective Energy Generation Planning Under Uncertainty , 1982 .

[20]  D. Chattopadhyay,et al.  Application of general algebraic modeling system to power system optimization , 1999 .

[21]  Yacov Y. Haimes,et al.  A multiobjective dynamic programming method for capacity expansion , 1981 .