Load balancing for group technology planning and control
暂无分享,去创建一个
Abstract Recent work on the cell-formation method developed at the C.I.T. has shown that the grouping of production facilities can be carried out in a very convenient way if the workload of the potential cells is used as a weighting factor. It has also been observed that the enforcement of additional constraints in the linear program used to obtain solutions yields a selected set of solutions and greatly reduces the computing effort. At the various stages of the calculations, the analyst finds several courses of action open of him. Thereafter, each decision is made in accordance with the corresponding policies of the firm. An illustration of the method is presented for a workshop with 84 different production facilities and 1100 part components.
[1] Gunter F. K. Purcheck,et al. Combinatorial Grouping— A Lattice-Theoretic Method for the Design of Manufacturing Systems , 1974 .
[2] G. Purcheck. A Linear–Programming Method for the Combinatorial Grouping of an Incomplete Power Set , 1975 .
[3] Gunter F.K. Purcheck,et al. A mathematical classification as a basis for the design of group-technology production cells , 1975 .