The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey
暂无分享,去创建一个
[1] Chih-Ming Liu,et al. Intelligent scheduling of FMSs with inductive learning capability using neural networks , 1995 .
[2] Joseph J. Talavage,et al. A mixed dispatching rule approach in FMS scheduling , 1994 .
[3] Ram Rachamadugu,et al. Classification and review of FMS scheduling procedures , 1994 .
[4] Gary D. Scudder,et al. Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives , 1992 .
[5] S. C. Kim,et al. Impact of sequence-dependent setup time on job shop scheduling performance , 1994 .
[6] Yuehwern Yih,et al. Integration of inductive learning and neural networks for multi-objective FMS scheduling , 1998 .
[7] Joe H. Mize,et al. Scheduling and control of flexible manufacturing systems: a critical review , 1994 .
[8] Thomas R. Hoffmann,et al. Composite cost-based rules for priority scheduling in a randomly routed job shop , 1985 .
[9] Robert E. Young,et al. The design of flexible manufacturing systems , 1993 .
[10] Kathryn E. Stecke,et al. Using mathematical programming and simulation to study FMS machine utilizations , 1987, WSC '87.
[11] Yoke San Wong,et al. Machine Selection Rules in a Dynamic Job Shop , 2000 .
[12] Homer Rahnejat,et al. Simulation aids design for flexible automation , 1986 .
[13] L. N. Van Wassenhove,et al. Analysis of Scheduling Rules for an FMS , 1990 .
[14] Hungtao Joseph Wen,et al. Formation and dynamic routing of part families among flexible manufacturing cells , 1993 .
[15] George Chryssolouris,et al. Manufacturing systems operation: Dispatch rules versus intelligent control , 1988 .
[16] Joseph M. Mellichamp,et al. FMS Designer: An expert system for flexible manufacturing system design , 1990 .
[17] Ihsan Sabuncuoglu,et al. A STUDY OF SCHEDULING RULES OF FLEXIBLE MANUFACTURING SYSTEMS : A SIMULATION APPROACH , 1998 .
[18] Robert M. O'Keefe,et al. Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system , 1992 .
[19] Robert M. O'Keefe,et al. Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base , 1992 .
[20] Jiyin Liu,et al. A new classification scheme for flexible manufacturing systems , 1993 .
[21] W. E. Wilhelm,et al. Effectiveness of alternate operations in a flexible manufacturing system , 1985 .
[22] Moshe M. Barash,et al. Operational control of item flow in versatile manufacturing systems , 1979 .
[23] Sang M. Lee,et al. A multi-objective production planning model in a flexible manufacturing environment , 1989 .
[24] Joseph J. Talavage,et al. Intelligent dispatching for flexible manufacturing , 1991 .
[25] Subhash Wadhwa,et al. Impact of Routing Flexibility on the Performance of an FMS—A Simulation Study , 1997 .
[26] N. Jawahar,et al. Knowledge-based workcell attribute oriented dynamic schedulers for flexible manufacturing systems , 1998 .
[27] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[28] Yuehwern Yih,et al. A competitive neural network approach to multi-objective FMS scheduling , 1998 .
[29] Felix T. S. Chan,et al. Simulation of Scheduling Rules in A Flexible Manufacturing System Using Fuzzy Logic , 1996, IEA/AIE.
[30] D. Harrison,et al. The Application of Parallel Multipopulation Genetic Algorithms to Dynamic Job-Shop Scheduling , 2000 .
[31] Hüseyin Sarper. Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem , 1994 .
[32] Andrew Kusiak,et al. Flexible Manufacturing Systems: A Structural Approach , 1985 .
[33] Ihsan Sabuncuoglu,et al. Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system , 1992 .
[34] Kwasi Amoako-Gyampah. A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix , 1994 .
[35] Felix T.S. Chan,et al. A fuzzy approach to operation selection , 1997 .
[36] Andrew Kusiak,et al. Intelligent scheduling of automated machining systems , 1992 .
[37] Richard Bellman,et al. Mathematical Aspects Of Scheduling And Applications , 1982 .
[38] Ronald D. Armstrong,et al. Single machine scheduling to minimize mean absolute lateness: A heuristic solution , 1990, Comput. Oper. Res..
[39] Eric M. Malstrom,et al. Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator , 1988 .
[40] Fts Chan,et al. Simulation of Flexible Manufacturing Systems via Fuzzy Control Scheduling , 1995 .
[41] Hans Ziegler,et al. Improving job shop performance by coordinating dispatching rules , 1997 .
[42] H. A. Pak,et al. Heuristical job allocation in a flexible manufacturing system , 1986 .
[43] Peter O'Grady. Controlling Automated Manufacturing Systems , 1987 .
[44] Farzad Mahmoodi,et al. The Effects of Scheduling Rules and Routing Flexibility on the Performance of a Random Flexible Manufacturing System , 1999 .
[45] János Nacsa,et al. Application of artificial intelligence to problems in advanced manufacturing systems , 1994 .
[46] S. G. Deshmukh,et al. Simulation for analysis of scheduling rules for a flexible manufacturing system , 1995 .
[47] P. Aravindan,et al. Development of a computer simulator for dynamic scheduling of FMS to achieve optimal performance , 1996 .
[48] C. R. Bector,et al. A review of scheduling rules in flexible manufacturing systems , 1989 .
[49] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[50] Ram Rachamadugu,et al. Scheduling with Sequencing Flexibility , 1993 .
[51] Ihsan Sabuncuoglu,et al. Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion , 1992 .
[52] W. M. Nawijn,et al. Quasi on-line scheduling Procedures for Flexible Manufacturing Systems , 1988 .
[53] Henry C. Co,et al. Sequencing in flexible manufacturing systems and other short queue-length systems , 1988 .
[54] Stanley B. Gershwin,et al. Flow optimization in flexible manufacturing systems , 1985 .
[55] Richard A. Wysk,et al. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells , 1988 .
[56] Sharad K. Maheshwari,et al. Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling system in FMS , 1995 .
[57] Mohamed F. Abin. Solution of scheduling problems of job-shop type FMS with alternative machine tools , 1986 .
[58] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[59] Gary D. Scudder,et al. Priority scheduling with cost considerations , 1983 .
[60] Chandrasekharan Rajendran,et al. A comparative analysis of two different approaches to scheduling in flexible flow shops , 2000 .
[61] Jim Hutchison,et al. Scheduling approaches for random job shop flexible manufacturing systems , 1991 .
[62] Felix T.S. Chan,et al. Real-time operation selection in an FMS using simulation- a fuzzy approach , 1997 .
[63] T. Sekiguchi,et al. Fuzzy inference-based multiple criteria FMS scheduling , 1999 .
[64] Yeong-Dae Kim. A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings , 1990 .
[65] Nagen Nagarur,et al. An integrated decision support system for FMS: using intelligent simulation , 1994 .
[66] Uttarayan Bagchi,et al. Experimental investigation of real-time scheduling in flexible manufacturing systems , 1985 .
[67] F. Frank Chen,et al. Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system , 1999, J. Intell. Manuf..
[68] K. Itoh,et al. Twofold look-ahead search for multi-criterion job shop scheduling , 1993 .
[69] Ranga V. Ramasesh. Dynamic job shop scheduling: A survey of simulation research , 1990 .
[70] J. A. Buzacott,et al. Flexible manufacturing systems: a review of analytical models , 1986 .
[71] J. Kaltwasser,et al. Hierarchical Control of Flexible Manufacturing Systems , 1986 .
[72] Bernard Grabot,et al. Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach , 1994 .
[73] Waldemar Karwowski,et al. Fuzzy concepts in production management research: a review , 1986 .
[74] Shinichi Nakasuka,et al. Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool , 1992 .
[75] Kathryn E. Stecke. Variations in flexible manufacturing systems according to the relevant types of automated materials handling , 1984 .
[76] Soumen Ghosh,et al. An evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling , 1993 .
[77] Peter O'Grady,et al. A concise review of flexible manufacturing systems and FMS literature , 1986 .
[78] Joong-In Kim,et al. Multi-criteria operational control rules in flexible manufacturing systems (FMSs) , 1990 .
[79] Hoda A. ElMaraghy. Simulation and graphical animation of advanced manufacturing systems , 1982 .
[80] Basheer M. Khumawala,et al. Scheduling random flexible manufacturing systems with dynamic environments , 1990 .
[81] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[82] Hans-Jürgen Zimmermann,et al. A method to control flexible manufacturing systems , 1989 .
[83] Yuehwern Yih,et al. A framework for part type selection and scheduling in FMS environments , 1995 .
[84] Xiaodong Xie,et al. A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility , 1993 .
[85] Li Lin,et al. Multiple-Objective Scheduling for the Hierarchical Control of Flexible Manufacturing Systems , 1999 .
[86] Fts Chan,et al. An intelligent fuzzy decision support system for scheduling of FMS , 1996 .
[87] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .