Evaluation of partial discharge detection techniques on hydro-generators in the Australian Snowy Mountains scheme. Tumut 1 case study
暂无分享,去创建一个
An evaluation of partial discharge detection techniques used on the Unit 3 hydroelectric generator stator windings at Tumut 1 power station in the Snowy Mountains scheme of Australia is presented. Measurements were made with an RF slot probe, Robinson ERA Model 5 detector, Ontario Hydro PDA-H detector and a recently developed partial discharge site location (PDSL) system before and after removal of coils. Good agreement was found between all methods with the PDSL system achieving high accuracy in identifying individual high discharging coil sides. >
[1] J. E. Timperley,et al. Improvements in corona probe testing of modern hydroelectric generators , 1989, Proceedings of the 19th Electrical Electronics Insulation Conference,.
[2] R. J. Jackson,et al. Discharge detection techniques for stator windings , 1985 .
[3] Michael J. Kurtz,et al. Experience with PDA diagnostic testing on hydraulic generators , 1988 .
[4] B. K. Gupta,et al. Review of generator surge coordination including generator breakers , 1988 .