Line balancing and model sequencing to reduce work overload in mixed-model U-line production environments

Mixed-model U-lines (MMULs) are important elements of just-in-time production systems. For successful implementation of MMULs, a smoothed workload distribution among workstations is important. This requires that line balancing and model sequencing problems are solved simultaneously. This article presents a mixed, zero–one, nonlinear mathematical programming formulation for balancing and sequencing MMULs simultaneously with the objective of reducing work overload. Since the problem is NP-hard, an effective simulated annealing approach is also presented and its performance compared with existing approaches. The results show that the proposed simulated annealing algorithm outperforms existing approaches.

[1]  Patrick R. McMullen,et al.  Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups , 2000 .

[2]  Candace Arai Yano,et al.  Sequencing to minimize work overload in assembly lines with product options , 1991 .

[3]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[4]  Yeongho Kim,et al.  An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines , 2006, Eur. J. Oper. Res..

[5]  Yeongho Kim,et al.  A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .

[6]  Patrick R. McMullen,et al.  A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem , 2001 .

[7]  J. Miltenberg,et al.  Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .

[8]  John Miltenburg,et al.  U-shaped production lines: A review of theory and practice , 2001 .

[9]  L. Tsai Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .

[10]  Ana S. Simaria,et al.  A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II , 2004, Comput. Ind. Eng..

[11]  Jin Zhu,et al.  A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines , 2000, Eur. J. Oper. Res..

[12]  J. L. C. Macaskill,et al.  Production-Line Balances for Mixed-Model Lines , 1972 .

[13]  George Steiner,et al.  A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems , 1990 .

[14]  Parviz Davami,et al.  New stable group explicit finite difference method for solution of diffusion equation , 2006, Appl. Math. Comput..

[15]  Yakup Kara,et al.  An approach for balancing and sequencing mixed-model JIT U-lines , 2007 .

[16]  G. J. Miltenburg,et al.  Developing production schedules which balance part usage and smooth production loads for just‐in‐time production systems , 1991 .

[17]  Yossi Bukchin,et al.  A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs , 2006, Eur. J. Oper. Res..

[18]  Patrick R. McMullen,et al.  An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics , 2001 .

[19]  Peter B. Luh,et al.  Mixed-model assembly line scheduling using the Lagrangian relaxation technique , 1997, Proceedings of the 1997 IEEE International Conference on Control Applications.

[20]  R Tavakkoli Moghaddam,et al.  MULTI-CRITERIA SEQUENCING PROBLEM FOR A MIXED-MODEL ASSEMBLY LINE IN A JIT PRODUCTION SYSTEM , 2006 .

[21]  Reza Tavakkoli-Moghaddam,et al.  A multi-objective scatter search for a mixed-model assembly line sequencing problem , 2007, Adv. Eng. Informatics.

[22]  S. Afshin Mansouri,et al.  A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines , 2005, Eur. J. Oper. Res..

[23]  G. Steiner,et al.  Level Schedules for Mixed-Model, Just-in-Time Processes , 1993 .

[24]  Wieslaw Kubiak,et al.  Optimal level schedules for mixed-model, multi-level just-in-time assembly systems , 1997, Ann. Oper. Res..

[25]  John Miltenburg,et al.  Balancing and Scheduling Mixed-Model U-Shaped Production Lines , 2002 .

[26]  P. Aravindan,et al.  Genetic algorithms for sequencing problems in mixed model assembly lines , 2003, Comput. Ind. Eng..

[27]  Ahmet Bolat,et al.  Algorithms for real-time scheduling of jobs on mixed model assembly lines , 1994, Comput. Oper. Res..

[28]  Ezey M. Dar-El,et al.  Assembly line sequencing for model mix , 1975 .

[29]  Patrick R. McMullen,et al.  An ant colony optimization approach to addressing a JIT sequencing problem with multiple objectives , 2001, Artif. Intell. Eng..

[30]  John Miltenburg,et al.  The mixed-model U-line balancing problem , 1998 .

[31]  Shigeji Miyazaki,et al.  Time-based goal chasing method for mixed-model assembly line problem with multiple work stations , 2002 .

[32]  Patrick R. McMullen,et al.  A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line , 2000 .

[33]  Alexander Ronstadt JUST-IN-TIME PRODUCTION SYSTEMS. , 1996 .

[34]  Mullen,et al.  JIT sequencing for mixed-model assembly lines with setups using Tabu Search , 1998 .

[35]  Timothy L. Urban,et al.  Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .

[36]  Hadi Gökçen,et al.  A goal programming approach to mixed-model assembly line balancing problem , 1997 .

[37]  S. Sethi,et al.  A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems" , 1991 .

[38]  Nick T. Thomopoulos,et al.  Mixed Model Line Balancing with Smoothed Station Assignments , 1970 .

[39]  Ju Hyun Chul,et al.  A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines , 1998, Comput. Oper. Res..

[40]  Ho-Gyun Kim,et al.  A robust design of simulated annealing approach for mixed-model sequencing , 2005, Comput. Ind. Eng..

[41]  Melih Özlen,et al.  A Lagrangean relaxation approach for the mixed-model flow line sequencing problem , 2008, Comput. Oper. Res..

[42]  S. David Wu,et al.  A new heuristic method for mixed model assembly line balancing problem , 2003 .

[43]  J. Wijngaard,et al.  The U-line balancing problem , 1994 .

[44]  Avraham Shtub,et al.  An analytic framework for sequencing mixed model assembly lines , 1992 .

[45]  Sun Jin Kim,et al.  Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm , 2000 .

[46]  Yeongho Kim,et al.  Sequencing in mixed model assembly lines: A genetic algorithm approach , 1996, Comput. Oper. Res..

[47]  Hadi Gökçen,et al.  Binary integer formulation for mixed-model assembly line balancing problem , 1998 .

[48]  John B. Kidd,et al.  Toyota Production System , 1993 .

[49]  Nick T. Thomopoulos,et al.  Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .

[50]  Serpil Sayin,et al.  Assembly line balancing in a mixed-model sequencing environment with synchronous transfers , 2003, Eur. J. Oper. Res..