An Extended Sequential Imperfect Preventive Maintenance Model with Improvement Factors

This article presents a generalization of the imperfect sequential preventive maintenance (PM) policy with minimal repair. As failures occur, the system experiences one of two types of failures: a Type-I failure (minor), rectified by a minimal repair; or a Type-II failure (catastrophic) that calls for an unplanned maintenance. In each maintenance period, the system is maintained following the occurrence of a Type-II failure or at age, whichever takes place first. At the Nth maintenance, the system is replaced rather than maintained. The imperfect PM model adopted in this study incorporates with improvement factors in the hazard-rate function. Taking age-dependent minimal repair costs into consideration, the objective consists of finding the optimal PM and replacement schedule that minimize the expected cost per unit time over an infinite time-horizon.

[1]  Toshio Nakagawa,et al.  Optimum Policies When Preventive Maintenance is Imperfect , 1979, IEEE Transactions on Reliability.

[2]  Shey-Huei Sheu,et al.  Generalized sequential preventive maintenance policy of a system subject to shocks , 2002, Int. J. Syst. Sci..

[3]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[4]  T. Nakagawa Periodic and sequential preventive maintenance policies , 1986 .

[5]  Shey-Huei Sheu A Generalized Block Replacement Policy with Minimal Repair and General Random Repair Costs for a Multi-unit System , 1991 .

[6]  Young Ho Chun,et al.  An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.

[7]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[8]  T. H. Savits Some multivariate distributions derived from a non-fatal shock model , 1988 .

[9]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[10]  Philip J. Boland Periodic replacement when minimal repair costs vary with time , 1982 .

[11]  N. Hastings The Repair Limit Replacement Method , 1969 .

[12]  Ming J. Zuo,et al.  General sequential imperfect preventive maintenance models , 2000 .

[13]  Shey-Huei Sheu,et al.  A Generalized Periodic Preventive Maintenance Model With Virtual Age for a System Subjected to Shocks , 2010 .

[14]  T. Nakagawa A summary of imperfect preventive maintenance policies with minimal repair , 1980 .

[15]  Toshio Nakagawa,et al.  Periodic-replacement models with threshold levels , 1991 .

[16]  D. G. Nguyen,et al.  Optimal Age-Policy with Imperfect Preventive Maintenance , 1981, IEEE Transactions on Reliability.

[17]  Menachem Berg,et al.  A Marginal Cost Analysis for an Age Replacement Policy With Minimal Repair , 1982 .

[18]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[19]  W. J. Chen,et al.  Single-machine scheduling with periodic maintenance and nonresumable jobs , 2003, Comput. Oper. Res..

[20]  D. N. Prabhakar Murthy,et al.  Optimal Preventive Maintenance Policies for Repairable Systems , 1981, Oper. Res..

[21]  N. A. J. Hastings,et al.  An Economic Replacement Model , 1967 .

[22]  Gregory Levitin,et al.  Optimization of imperfect preventive maintenance for multi-state systems , 2000, Reliab. Eng. Syst. Saf..