Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects

AbstractEach participant in a building construction project requires a dedicated work space in which to execute their activities. In this environment, inappropriate work-space planning in a construction site causes work-space problems, which results in a loss of productivity, safety hazards, and issues of poor quality. Therefore, the work space should be considered one of the most important resources and constraints to manage at a construction site. However, current construction planning techniques have proven to be insufficient for work-space planning because they do not account for the spatial feature of each activity. To establish a formalized work-space planning process, therefore, this paper categorizes work space by its function and movability and suggests a framework for a work-space planning process that contains five phases, including 4D building information model (BIM) generation, work-space requirement identification, work-space occupation representation, work-space problem identification, and ...

[1]  Charles M. Eastman,et al.  BIM Tools and Parametric Modeling , 2008 .

[2]  Sy-Jye Guo,et al.  Identification and Resolution of Work Space Conflicts in Building Construction , 2002 .

[3]  Burcu Akinci,et al.  Representing Work Spaces Generically in Construction Method Models , 2002 .

[4]  Jian-Ping Zhang,et al.  4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .

[5]  Vineet R. Kamat,et al.  Real-Time Hybrid Virtuality for Prevention of Excavation Related Utility Strikes , 2014, J. Comput. Civ. Eng..

[6]  Raj Madhavan,et al.  Benchmarking and standardization of intelligent robotic systems , 2009, 2009 International Conference on Advanced Robotics.

[7]  Burcu Akinci,et al.  Formalization and Automation of Time-Space Conflict Analysis , 2002 .

[8]  Yvan J. Beliveau,et al.  Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings , 1994 .

[9]  Iris D. Tommelein,et al.  Interactive Dynamic Layout Planning , 1993 .

[10]  Gary David Holt,et al.  Severity diagnosis of productivity problems - A reliability analysis , 1998 .

[11]  Osama Moselhi,et al.  Computer-aided site layout planning , 2006 .

[12]  David R. Riley,et al.  Space Planning Method for Multistory Building Construction , 1997 .

[13]  V. K. Bansal Use of GIS and Topology in the Identification and Resolution of Space Conflicts , 2011 .

[14]  David K. H. Chua,et al.  Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design , 2010 .

[15]  Graham Winch,et al.  Critical Space Analysis , 2006 .

[16]  Nashwan Dawood,et al.  Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies , 2006, Comput. Aided Civ. Infrastructure Eng..

[17]  Kwok-wing Chau,et al.  Four-dimensional visualization of construction scheduling and site utilization , 2004 .

[18]  David R. Riley,et al.  Patterns of Construction-Space Use in Multistory Buildings , 1995 .

[19]  Tarek Zayed,et al.  Cell-based representation and analysis of spatial resources in construction simulation , 2007 .

[20]  Chaoqiang Tu,et al.  Research on Collision Detection Algorithm Based on AABB-OBB Bounding Volume , 2009, 2009 First International Workshop on Education Technology and Computer Science.

[21]  Zaki Mallasi,et al.  Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation , 2006 .

[22]  Mohamed Al-Hussein,et al.  Equipment workspace analysis in infrastructure projects , 2007 .

[23]  Khaled A El-Rayes,et al.  Optimal utilization of interior building spaces for material procurement and storage in congested construction sites , 2013 .