An improved ant colony optimization algorithm for nonlinear resource-leveling problems
暂无分享,去创建一个
[1] Javier Roca,et al. Solving an Extended Resource Leveling Problem with Multiobjective Evolutionary Algorithms , 2008 .
[2] T. Warren Liao,et al. Improved ant colony optimization algorithms for determining project critical paths , 2010 .
[3] Marco Dorigo,et al. Optimization, Learning and Natural Algorithms , 1992 .
[4] Hartmut Schmeck,et al. Ant colony optimization for resource-constrained project scheduling , 2000, IEEE Trans. Evol. Comput..
[5] Luca Maria Gambardella,et al. Ant colony system: a cooperative learning approach to the traveling salesman problem , 1997, IEEE Trans. Evol. Comput..
[6] Marco Dorigo,et al. Distributed Optimization by Ant Colonies , 1992 .
[7] Sou-Sen Leu,et al. RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .
[8] Martin Middendorf,et al. An Island Model Based Ant System with Lookahead for the Shortest Supersequence Problem , 1998, PPSN.
[9] Eric Bonabeau,et al. Evolving Ant Colony Optimization , 1998, Adv. Complex Syst..
[10] Wang Chen,et al. An efficient hybrid algorithm for resource-constrained project scheduling , 2010, Inf. Sci..