Optimal schedule recovery for the aircraft gate assignment with constrained resources
暂无分享,去创建一个
[1] Cemalettin Ozturk,et al. Developing a mathematical model for scheduling of turnaround operations (low cost airline as a case study) , 2016 .
[2] Jonathan F. Bard,et al. Balancing user preferences for aircraft schedule recovery during irregular operations , 2000 .
[3] Cheng-Lung Wu,et al. Modelling and optimization of aircraft turnaround time at an airport , 2004 .
[4] Bo Li,et al. Study on an improved adaptive PSO algorithm for solving multi-objective gate assignment , 2017, Applied Soft Computing.
[5] Michael Schultz,et al. A Passenger-Centric Model for Reducing Missed Connections at Low Cost Airports With Gates Reassignment , 2019, IEEE Access.
[6] Luis Delgado,et al. Flight and passenger delay assignment optimization strategies , 2017 .
[7] Michael Schmidt,et al. A review of aircraft turnaround operations and simulations , 2017 .
[8] Ling Wang,et al. A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold , 2019, IEEE Transactions on Cybernetics.
[9] Javier Del Ser,et al. Comparative study of pheromone control heuristics in ACO algorithms for solving RCPSP problems , 2017, Appl. Soft Comput..
[10] Amedeo R. Odoni,et al. An Integrated Scheduling and Operations Approach to Airport Congestion Mitigation , 2015, Oper. Res..
[11] Andrew Lewis,et al. Grasshopper Optimisation Algorithm: Theory and application , 2017, Adv. Eng. Softw..
[12] Damla Kizilay,et al. An Ensemble of Meta-Heuristics for the Energy-Efficient Blocking Flowshop Scheduling Problem , 2019, Procedia Manufacturing.
[13] Allan Larsen,et al. Airline Disruption Management - Perspectives, Experiences and Outlook , 2007 .
[14] Gerhard Friedrich,et al. Extending the RCPSP for modeling and solving disruption management problems , 2008, Applied Intelligence.
[15] Y J Cheng. Network-Based Simulation of Aircraft at Gates in Airport Terminals , 1998 .
[16] Salma Fitouri-Trabelsi,et al. A bi-objective approach for scheduling ground-handling vehicles in airports , 2016, Comput. Oper. Res..
[17] Ali Kaveh,et al. Geometry and Sizing Optimization of Steel Pitched Roof Frames with Tapered Members Using Nine Metaheuristics , 2018, Iranian Journal of Science and Technology, Transactions of Civil Engineering.
[18] T. Glenn Bailey,et al. The airport gate assignment problem: mathematical model and a tabu search algorithm , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.
[19] Ibrahim Eksin,et al. A stochastic neighborhood search approach for airport gate assignment problem , 2012, Expert Syst. Appl..
[20] Jean-Philippe Gayon,et al. Exact and heuristic approaches to the airport stand allocation problem , 2015, Eur. J. Oper. Res..
[21] Mitsuo Gen,et al. Metaheuristics optimization approaches for two-stage reentrant flexible flow shop with blocking constraint , 2015, Expert Syst. Appl..
[22] Muzaffar Eusuff,et al. Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization , 2006 .
[23] Zhe Xu,et al. New heuristics for the RCPSP with multiple overlapping modes , 2019, Comput. Ind. Eng..
[24] Cynthia Barnhart,et al. Flight operations recovery: New approaches considering passenger recovery , 2006, J. Sched..
[25] Daniel Guimarans,et al. An Improved Method for Scheduling Aircraft Ground Handling Operations From a Global Perspective , 2019, Asia Pac. J. Oper. Res..
[26] Yury Nikulin,et al. Multicriteria airport gate assignment and Pareto simulated annealing , 2008 .
[27] Robert Pellerin,et al. A survey of hybrid metaheuristics for the resource-constrained project scheduling problem , 2020, Eur. J. Oper. Res..
[28] Bidisha Roy,et al. Meta-heuristic Techniques to Solve Resource-Constrained Project Scheduling Problem , 2018, International Conference on Innovative Computing and Communications.
[29] Tao Feng,et al. Comparative analysis on propagation effects of flight delays: a case study of China airlines , 2018 .
[30] Yi Zhu,et al. The over-constrained airport gate assignment problem , 2005, Comput. Oper. Res..
[31] Di Yuan,et al. Airport logistics – A case study of the turn-around process , 2012 .
[32] Imed Kacem,et al. Genetic Algorithms for Solving Flexible Job Shop Scheduling Problems , 2013 .
[33] Ruhul A. Sarker,et al. Hybrid evolutionary algorithm for large-scale project scheduling problems , 2020, Comput. Ind. Eng..
[34] Xiaoming Wang,et al. Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness , 2020, Comput. Ind. Eng..
[35] Ezequiel A. Di Paolo,et al. An efficient Genetic Algorithm with uniform crossover for the multi-objective Airport Gate Assignment Problem , 2007, 2007 IEEE Congress on Evolutionary Computation.
[36] Taher Niknam,et al. A new hybrid algorithm for optimal power flow considering prohibited zones and valve point effect , 2012 .
[37] Betul Yagmahan,et al. The comparison of the metaheuristic algorithms performances on airport gate assignment problem , 2017 .
[38] Hartmut Fricke,et al. Coping with Uncertainties in Predicting the Aircraft Turnaround Time at Airports , 2019, OR.
[39] A Bolat,et al. Models and a genetic algorithm for static aircraft-gate assignment problem , 2001, J. Oper. Res. Soc..
[40] Yi Zhu,et al. Airport Gate Scheduling with Time Windows , 2005, Artificial Intelligence Review.
[41] Ali Haghani,et al. Mathematical models for flight-to-gate reassignment with passenger flows: State-of-the-art comparative analysis, formulation improvement, and a new multidimensional assignment model , 2018, Comput. Ind. Eng..
[42] Seyed Jafar Sadjadi,et al. A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities , 2017 .
[43] Pragya Sharma,et al. Locally Informed Shuffled Frog Leaping Algorithm , 2016, SocProS.