A shop floor can be considered as an important level to develop Computer Integrated Manufacturing system (CIMs). However, a shop floor is a dynamic environment where unexpected events continuously occur, and impose changes to the planned activities. To deal with this problem, a shop floor should adopt an appropriate control system that is responsible for the coordination and control of the manufacturing physical flow and information flow. In this paper, a hybrid control system is described with a shop floor activity methodology called Multi-Layered Task Initiation Diagram (MTD). The architecture of the control model contains three levels: i.e., the shop floor controller (SFC), the intelligent agent controller (IAC) and the equipment controller (EC). The methodology behind the development of the control system is an intelligent multi-agent paradigm that enables the shop floor control system to be an independent, an autonomous, and distributed system, and to achieve an adaptability to change of the manufacturing environment.
[1]
Chen-Fu Chien,et al.
An object-oriented analysis and design method for shop floor control systems
,
1998,
Int. J. Comput. Integr. Manuf..
[2]
Neil A. Duffie,et al.
Real-time distributed scheduling of heterarchical manufacturing systems
,
1994
.
[3]
Peter Buchholz,et al.
Hierarchical Structuring of Superposed GSPNs
,
1999,
IEEE Trans. Software Eng..
[4]
James J. Solberg,et al.
Effectiveness of flexible routing control
,
1991
.
[5]
Khalid Kouiss,et al.
Using multi-agent architecture in FMS for dynamic scheduling
,
1997,
J. Intell. Manuf..
[6]
Joe H. Mize Fellow Iie,et al.
MODELING OF INTEGRATED MANUFACTURING SYSTEMS USING AN OBJECT-ORIENTED APPROACH
,
1992
.
[7]
David M. Dilts,et al.
The evolution of control architectures for automated manufacturing systems
,
1991
.