Optimal allocation of fleet’s spare parts for system reliability

Allocation of fleet’s spare parts is rarely studied due to its complexity. However, this task is extremely important because the warship’s service level highly relies on the maintenance logistics’ level. In this study, the readiness ratio is proposed as a critical index in measuring the system’s reliability. A well-established mathematical model adopting the optimization method of spare part allocation is also introduced. The objective is to minimize the number of each spare part while satisfying the fleet’s system reliability. The fault tree analysis (FTA) is applied to analyze the system’s failure logic and stratify the units on ship. As a result, the strategy of spare part sharing can be introduced in detail. The solution algorithm is developed, and the simulation experiments to obtain the key parameters are conducted. The proposed model and algorithm are applied to an actual fleet of two warships, and results show that the method above is feasible and can be directly applied into practice.

[1]  Cai Zhi-min Warship formation spare parts allotment optimization method under multi-constraints , 2015 .

[2]  Craig C. Sherbrooke,et al.  VARI-METRIC: Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models , 1986, Oper. Res..

[3]  Uday Kumar,et al.  Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran , 2008, Reliab. Eng. Syst. Saf..

[4]  Hong Yi,et al.  Numerical simulation to reliability analysis of fault-tolerant repairable system , 2010 .

[5]  Whm Henk Zijm,et al.  Spare parts management at complex technology-based organizations: an agenda for research , 2001 .

[6]  R J Hillestad,et al.  Dyna-METRIC: Dynamic Multi-Echelon Technique for Recoverable Item Control. , 1982 .

[7]  So Young Sohn,et al.  Finding the optimal CSP inventory level for multi-echelon system in Air Force using random effects regression model , 2007, Eur. J. Oper. Res..

[8]  Dirk Cattrysse,et al.  Multi-item spare parts systems with lateral transshipments and waiting time constraints , 2006, Eur. J. Oper. Res..

[9]  Stephen C. Graves,et al.  A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .

[10]  W. J. Kennedy,et al.  An overview of recent literature on spare parts inventories , 2002 .

[11]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[12]  Andrew Simpson,et al.  The development of a hierarchical forecasting method for predicting spare parts demand in the South Korean Navy , 2012 .

[13]  Dan Li,et al.  Reliability and safety analysis of an Underwater Dry Maintenance Cabin , 2010 .

[14]  Shahrul Kamaruddin,et al.  An overview of time-based and condition-based maintenance in industrial application , 2012, Comput. Ind. Eng..