A fuzzy AHP methodology for selection of risk assessment methods in occupational safety
暂无分享,去创建一个
Ali Fuat Guneri | Muhammet Gul | Senim Ozgurler | M. Gul | A. Guneri | Senim Ozgurler | Muhammet Gul
[1] Alev Taskin Gumus,et al. Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology , 2009, Expert Syst. Appl..
[2] Yi-Hsuan Chen,et al. A fuzzy MCDM approach for evaluating banking performance based on Balanced Scorecard , 2009, Expert Syst. Appl..
[3] Hing Kai Chan,et al. Fuzzy Extent Analysis for Food Risk Assessment , 2013 .
[4] Francisco Rodrigues Lima Junior,et al. A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection , 2014, Appl. Soft Comput..
[5] J. Buckley,et al. Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).
[6] Erik Hollnagel,et al. HUMAN RELIABILITY ASSESSMENT IN CONTEXT , 2005 .
[7] I. Mohammadfam,et al. Application of Hazard and Operability Study (HAZOP) in Evaluation of Health, Safety and Environmental (HSE) Hazards , 2012 .
[8] Miley W. Merkhofer,et al. Risk Assessment Methods: Approaches for Assessing Health and Environmental Risks , 1993 .
[9] Cengiz Kahraman,et al. Fuzzy Analytic Hierarchy Process and its Application , 2008 .
[10] P. K. Marhavilas,et al. Risk analysis and assessment methodologies in the work sites: On a review, classification and comparative study of the scientific literature of the period 2000–2009 , 2011 .
[11] Cengiz Kahraman,et al. Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey , 2004 .
[12] Gilles Dusserre,et al. Review of 62 risk analysis methodologies of industrial plants , 2002 .
[13] Ying Wang,et al. Selecting a cruise port of call location using the fuzzy-AHP method: A case study in East Asia , 2014 .
[14] Metin Celik,et al. Application of fuzzy extended AHP methodology on shipping registry selection: The case of Turkish maritime industry , 2009, Expert Syst. Appl..
[15] D. Chang. Applications of the extent analysis method on fuzzy AHP , 1996 .
[16] Abel Pinto,et al. Risk Assessment in Construction Industry ? Overview and Reflection , 2011 .
[17] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[18] Irfan Ertugrul,et al. Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods , 2009, Expert Syst. Appl..
[19] Seyed Bagher Hosseini,et al. Risk assessment model selection in construction industry , 2011, Expert Syst. Appl..
[20] İhsan Yüksel,et al. A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system , 2008 .
[21] Faisal Khan,et al. Mathematical model for HAZOP study time estimation , 1997 .
[22] Stephen O. Ogunlana,et al. Selection and application of risk management tools and techniques for build-operate-transfer projects , 2004, Ind. Manag. Data Syst..
[23] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[24] Ksenija Mandic,et al. Analysis of the financial parameters of Serbian banks through the application of the fuzzy AHP and TOPSIS methods , 2014 .