Case Study: Maintenance Proposal of Press Parts Production for Minimize Waste by Lean Manufacturing – Value Stream Mapping (VSM)

Abstract —Higher competition in businesslike field demanded each company acted as a value creator with progressive fixing performance. One of effort in increasing productivity was reducing waste. Enterprise T have seven type of extravagance were over production, transportation, inventory, over processing, motion waiting and defect. Minimize waste have bond with production time which could increase efficiency on using electricity and decreased lead time. Production process in this company showed non-value added time such as excessively material transportation in picking area and so the workers too much waited for the next schedule activity. This condition caused higher product lead time. Lean manufacturing idea necessary was implemented with using tool Value Stream Mapping – VSM. This strategy would resumed for the company maintenance and the result showed that lacking as much 26,45% of lead time could be a problem solution. Reducing lead time could be higher if the company have applied and played continue improvement. Keywords —lead time, lean manufacturing, value stream mapping.

[1]  Michael Lewis,et al.  Lean production and sustainable competitive advantage , 2000 .

[2]  Nikola Gjeldum,et al.  Simulation of production process reorganized with Value Stream Mapping , 2011 .

[3]  Brijesh Singh,et al.  The Lean Startup:How Today's Entrepreneurs Use Continuous Innovation to Create Radically Successful Businesses , 2016 .

[4]  Jiwen Sun,et al.  Simulation guided value stream mapping and lean improvement: A case study of a tubular machining facility , 2013 .

[5]  Stephen L. Woehrle,et al.  Using Dynamic Value Stream Mapping and Lean Accounting Box Scores to Support Lean Implementation. , 2010 .

[6]  Hung Da Wan,et al.  Leanness Score of Value Stream Maps , 2007 .

[7]  William Faulkner,et al.  Sustainable Value Stream Mapping (Sus-VSM): methodology to visualize and assess manufacturing sustainability performance , 2014 .

[8]  Naresh Chauhan,et al.  Benefits of Value Stream Mapping as A Lean Tool Implementation Manufacturing Industries : A Review , 2015 .

[9]  Sibi Chacko,et al.  Energy Conservation for a Paint Company Using Lean Manufacturing Technique , 2013 .

[10]  Bo Meng,et al.  The Application of Value Stream Mapping Based Lean Production System , 2010 .

[11]  Deepak Kumar,et al.  Implementation of Lean in Continuous Industry: A Case Study (Steel Industry) , 2014 .

[12]  Taho Yang,et al.  Lean production system design for fishing net manufacturing using lean principles and simulation optimization , 2015 .

[13]  Fazleena Badurdeen,et al.  Visualizing Sustainability Performance of Manufacturing Systems using Sustainable Value Stream Mapping (Sus-VSM) , 2012 .