Economics and financing of small modular reactors (SMRs)
暂无分享,去创建一个
[1] Ioannis N. Kessides,et al. The Future of the Nuclear Industry Reconsidered: Risks, Uncertainties, and Continued Potential , 2012 .
[2] G. Bortolan,et al. A review of some methods for ranking fuzzy subsets , 1985 .
[3] Christian Gollier,et al. Choice of Nuclear Power Investments under Price Uncertainty: Valuing Modularity , 2005 .
[4] Paul A. David,et al. Standardization, diversity and learning: Strategies for the coevolution of technology and industrial capacity , 1996 .
[5] Giorgio Locatelli,et al. Large and small baseload power plants: Drivers to define the optimal portfolios , 2011 .
[6] Gwo-Hshiung Tzeng,et al. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..
[7] T. P. Wright,et al. Factors affecting the cost of airplanes , 1936 .
[8] Giorgio Locatelli,et al. Financial Case Studies on Small- and Medium-Size Modular Reactors , 2012 .
[9] R. Langlois. Modularity in technology and organization , 2002 .
[10] David Kennedy. New nuclear power generation in the UK: Cost benefit analysis , 2007 .
[11] Arnulf Grubler,et al. The costs of the French nuclear scale-up: A case of negative learning by doing , 2010 .
[12] Giorgio Locatelli,et al. Small-medium sized nuclear coal and gas power plant: A probabilistic analysis of their financial performances and influence of CO2 cost , 2010 .
[13] Giorgio Locatelli,et al. Looking back to see the future: building nuclear power plants in Europe , 2012 .
[14] Ferenc L. Toth,et al. Oil and nuclear power: Past, present, and future B , 2006 .
[15] John M. Marshall,et al. Costs of Nuclear Power Plant Construction: Theory and New Evidence , 1991 .
[16] Sara Boarin,et al. Cost and Profitability Analysis of Modular SMRs in Different Deployment Scenarios , 2009 .
[17] Atsuyuki Suzuki,et al. Analysis of the decision to invest for constructing a nuclear power plant under regulation of electricity price , 2004, Decis. Support Syst..
[18] Nathan E. Hultman,et al. A reactor-level analysis of busbar costs for US nuclear plants, 1970-2005 , 2007 .
[19] Claudio R. Frischtak. Learning and technical progress in the commuter aircraft industry: an analysis of Embraer's experience , 1994 .
[20] Danilo Feretić,et al. Probabilistic analysis of electrical energy costs comparing: production costs for gas, coal and nuclear power plants , 2005 .
[21] E. Carayannis. Re-engineering high risk, high complexity industries through multiple level technological learning A case study of the world nuclear power industry , 1996 .
[22] R. J. Kuo,et al. A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network , 2002, Comput. Ind..
[23] Giorgio Locatelli,et al. Economic features of integral, modular, small-to-medium size reactors , 2010 .
[24] Giorgio Locatelli,et al. The role of the reactor size for an investment in the nuclear sector: an evaluation of not-financial parameters , 2011 .
[25] Giorgio Locatelli,et al. A framework for the selection of the right nuclear power plant , 2012 .
[26] J. Buckley. Ranking alternatives using fuzzy numbers , 1985 .
[27] Michael W. Golay,et al. Modular design and construction techniques for nuclear power plants , 1997 .
[28] Ching-Chow Yang,et al. KEY QUALITY PERFORMANCE EVALUATION USING FUZZY AHP , 2004 .
[29] Daniel T Ingersoll,et al. Deliberately Small Reactors and the Second Nuclear Era , 2009 .
[30] Giorgio Locatelli,et al. Competitiveness of Small-Medium, New Generation Reactors: A Comparative Study on Decommissioning , 2010 .
[31] Giorgio Locatelli,et al. Impact of the external factors in the nuclear field: a comparison between Small Medium Reactors vs. Large Reactors , 2009 .
[32] Giorgio Locatelli,et al. Smaller sized reactors can be economically attractive , 2008 .
[33] Anthony C. Krautmann,et al. Economies of Scale in Nuclear Power Generation , 1988 .
[34] Geoffrey Rothwell,et al. Measuring standardization: An application to the American and French nuclear power industries , 1996 .