Determination of optimum unit load size of the AGV in an electronics assembly production system

This paper deals with the problem of determining an optimum unit load size of automated guided vehicle (AGV) in an electronics assembly production line. It is assumed that an AGV delivers assembly parts to each workstation from a miniload automated storage/retrieval system and a conveyor line transports subassemblies between workstations. Two types of operating policies for the AGV system are proposed. For each policy, a nonlinear mathematical model is formulated. Based on the characteristics of the objective function and feasible region, a solution algorithm is developed, which finds an optimum unit load size. To illustrate the models, problems are chosen and solved.

[1]  William L. Maxwell,et al.  Design of Automatic Guided Vehicle Systems , 1982 .

[2]  James MacGregor Apple Material Handling Systems Design , 1972 .

[3]  P. J. Egbelu,et al.  The use of non-simulation approaches in estimating vehicle requirements in an automated guided based transport system , 1987 .

[4]  T. T. Narendran,et al.  Determination of unit load sizes in an AGV-based material handling system for an FMS , 1992 .

[5]  J. M. A. Tanchoco,et al.  Flow path design for automated guided vehicle systems , 1987 .

[6]  Pius J. Egbelu,et al.  Material flow control in AGV/unit load based production lines , 1988 .

[7]  D. L. Kimbler,et al.  Assignement of AGVS with different vehicle types , 1987 .

[8]  J. M. A. Tanchoco,et al.  Virtual flow paths for free-ranging automated guided vehicle systems , 1989 .

[9]  J. Tanchoco,et al.  Intersection graph method for AGV flow path design , 1991 .

[10]  Pius J. Egbelu,et al.  Determination of the total number of vehicles in an AGV-based material transport system , 1987 .

[11]  R. G. Kasilingam Mathematical modeling of the AGVS capacity requirements planning problem , 1991 .

[12]  J. Tanchoco,et al.  Optimal flow path design of unidirectional AGV systems , 1990 .

[13]  John K. Jackman Unit Load Size Determination Based on Economic Move Quantity , 1991 .

[14]  Pius J. Egbelu,et al.  Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system , 1993 .

[15]  Shimon Y. Nof,et al.  Part kitting in robotic facilities , 1986 .

[16]  T. T. Narendran,et al.  Design of an automated guided vehicle-based material handling system for a flexible manufacturing system , 1990 .