An efficient forward-backward algorithm to MSDEPP including batteries and voltage control devices

Electric distribution networks are now in the era of transition from passive to active distribution networks with the integration of energy storage devices. Optimal usage of batteries and voltage control devices along with other upgrades in network needs a distribution expansion planning (DEP) considering inter-temporal dependencies of stages. This paper presents an efficient approach for solving multi-stage distribution expansion planning problems (MSDEPP) based on a forward-backward approach considering energy storage devices such as batteries and voltage control devices such as voltage regulators and capacitors. The proposed algorithm is compared with three other techniques including full dynamic, forward fill-in, backward pull-out from the point of view of their precision and their computational efficiency. The simulation results for the IEEE 13 bus network show the proposed pseudo-dynamic forward-backward approach presents good efficiency in precision and time of optimization.

[1]  S. Krajcar,et al.  LONG TERM MULTI-STAGE PLANNING OF OPEN LOOP DISTRIBUTION NETWORKS UNDER UNCERTAINTY , 2005 .

[2]  R. Shoults,et al.  Optimal Distribution Substation and Primary Feeder Planning VIA the Fixed Charge Network Formulation , 1982, IEEE Transactions on Power Apparatus and Systems.

[3]  Arindam Ghosh,et al.  Optimal distribution network reinforcement considering load growth, line loss and reliability , 2013, 2013 IEEE Power & Energy Society General Meeting.

[4]  Mahmoud-Reza Haghifam,et al.  Distribution network expansion considering distributed generation and storage units using modified PSO algorithm , 2013 .

[5]  João Tomé Saraiva,et al.  A multiyear dynamic transmission expansion planning model using a discrete based EPSO approach , 2012 .

[6]  J. Teng A direct approach for distribution system load flow solutions , 2003 .

[7]  G. J. Berg,et al.  Dynamic transmission planning under uncertainty , 1985 .

[8]  I.J. Ramirez-Rosado,et al.  Pseudodynamic planning for expansion of power distribution systems , 1991, IEEE Power Engineering Review.

[9]  Salman Mohagheghi,et al.  Particle Swarm Optimization: Basic Concepts, Variants and Applications in Power Systems , 2008, IEEE Transactions on Evolutionary Computation.

[10]  R. Eberhart,et al.  Comparing inertia weights and constriction factors in particle swarm optimization , 2000, Proceedings of the 2000 Congress on Evolutionary Computation. CEC00 (Cat. No.00TH8512).

[11]  Carmen L. T. Borges,et al.  Multistage expansion planning for active distribution networks under demand and Distributed Generation uncertainties , 2012 .

[12]  T. Fawzi,et al.  A New Planning Model for Distribution Systems , 1983, IEEE Transactions on Power Apparatus and Systems.

[13]  Fabrizio Giulio Luca Pilo,et al.  Multi-year optimal planning of active distribution networks , 2007 .

[14]  G. Ledwich,et al.  Integrated Distribution Systems Planning to Improve Reliability Under Load Growth , 2012, IEEE Transactions on Power Delivery.