Process analysis and reengineering
暂无分享,去创建一个
[1] David Shorter. An evaluation of CIM modelling constructs: evaluation report of constructs for views according to ENV 40 003 , 1994 .
[2] J. S. Busby,et al. The value and limitations of using process models to describe the manufacturing organization , 1993 .
[3] Dirk Beeckman,et al. CIM-OSA: computer integrated manufacturing—open system architecture , 1989 .
[4] Thomas H. Davenport,et al. Process Innovation: Reengineering Work Through Information Technology , 1992 .
[5] Kwangsoo Kim,et al. An object-oriented information modeling methodology for manufacturing information systems , 1993 .
[6] George P. Richardson,et al. Introduction to System Dynamics Modeling with DYNAMO , 1981 .
[7] J. Porras. Stream analysis : a powerful way to diagnose and manage organizational change , 1987 .
[8] Andrew Kusiak,et al. Risk assessment of process models , 1996 .
[9] Donna B. Stoddard,et al. Reengineering: Business Change of Mythic Proportions? , 1994, MIS Q..
[10] Andrew Kusiak,et al. Reliability evaluation of process models , 1996 .
[11] Andrew Kusiak,et al. Intelligent Systems in Design and Manufacturing , 1994 .
[12] A. John Pendlebury,et al. Business Process Reengineering: Breakpoint Strategies for Market Dominance , 1993 .
[13] Mary E.S. Loomis,et al. The Database Book , 1986 .
[14] David O'Sullivan,et al. Manufacturing Systems Redesign: Creating the Integrated Manufacturing Environment , 1994 .
[15] A. Kusiak,et al. Resource constrained scheduling of hierarchically structured design activity networks , 1995 .
[16] Kirk D. Fiedler,et al. Business Process Reengineering: Charting a Strategic Path for the Information Age , 1994 .
[17] M. Hammer,et al. REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .
[18] Cheng Leong Ang,et al. IDEF0 modelling for project risk assessment , 1993 .
[19] James Lyle Peterson,et al. Petri net theory and the modeling of systems , 1981 .