A deterministic aggregate production planning model considering quality of products

Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

[1]  Brian H. Kleiner,et al.  Aggregate planning today , 1994 .

[2]  Udatta S. Palekar,et al.  Aggregate production planning for a continuous reconfigurable manufacturing process , 2005, Comput. Oper. Res..

[3]  S. D'Amours,et al.  The value of sales and operations planning in oriented strand board industry with make-to-order manufacturing system: Cross functional integration under deterministic demand and spot market recourse , 2008 .

[4]  Adil Baykasoğlu MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search , 2001 .

[5]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .

[6]  Carlos Romero,et al.  A general structure of achievement function for a goal programming model , 2004, Eur. J. Oper. Res..

[7]  Lazaros G. Papageorgiou,et al.  Optimal maintenance planning and crew allocation for multipurpose batch plants , 2004 .

[8]  Tien-Fu Liang,et al.  Application of fuzzy multi-objective linear programming to aggregate production planning , 2004, Comput. Ind. Eng..

[9]  S.M.T. Fatemi Ghomi,et al.  Integrated markdown pricing and aggregate production planning in a two echelon supply chain: A hybrid fuzzy multiple objective approach , 2012 .

[10]  Mir-Bahador Aryanezhad,et al.  A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty , 2011 .

[11]  Nils Brunsson My own book review : The Irrational Organization , 2014 .

[12]  A. Ravindran,et al.  Computational feasibility of multi-criteria models of production, planning and scheduling , 1988 .

[13]  S. Chopra,et al.  Supply Chain Management: Strategy, Planning & Operation , 2007 .

[14]  Hlynur Stefansson,et al.  Integration of multi-scale planning and scheduling problems , 2006 .

[15]  Leena Suhl,et al.  Aggregate production planning in the automotive industry with special consideration of workforce flexibility , 2011 .

[16]  Joao Paulo Brito da Silva,et al.  A labour-constrained model for aggregate production planning , 2000 .

[17]  Donya Rahmani,et al.  An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search , 2012, Expert Syst. Appl..

[18]  Stephen C. H. Leung,et al.  A goal programming model for aggregate production planning with resource utilization constraint , 2009, Comput. Ind. Eng..

[19]  Vaidyanathan Jayaraman,et al.  Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach , 2006 .

[20]  Rasaratnam Logendran,et al.  Aggregate production planning — A survey of models and methodologies , 1992 .

[21]  Ahmed K. Rifai,et al.  A note on the structure of the goal‐programming model: assessment and evaluation , 1996 .

[22]  A. G. Lagodimos,et al.  Hierarchical production planning for multi-product lines in the beverage industry , 2007 .

[23]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[24]  Atul P. Kanyalkar,et al.  An integrated aggregate and detailed planning in a multi-site production environment using linear programming , 2005 .

[25]  Konstantin Kogan,et al.  Balancing facilities in aggregate production planning: Make-to-order and make-to-stock environments , 1998 .

[26]  Lazaros G. Papageorgiou,et al.  Simultaneous maintenance considerations and production planning in multi-purpose plants , 2000, Annual Reliability and Maintainability Symposium. 2000 Proceedings. International Symposium on Product Quality and Integrity (Cat. No.00CH37055).

[27]  Waiel F. Abd El-Wahed,et al.  Interactive fuzzy goal programming for multi-objective transportation problems ☆ , 2006 .