The "Orchard" scheduler for manufacturing systems
暂无分享,去创建一个
[1] Stanley Gershwin,et al. An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[2] Robert J. Wittrock. Operator assignment and the parametric preflow algorithm , 1992 .
[3] Sunder Kekre,et al. SCHED-STAR A PRICE-BASED SHOP SCHEDULING MODULE , 1988 .
[4] James C. Bean,et al. Match-up real-time scheduling , 1985 .
[5] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[6] Lawrence M. Wein,et al. Optimal Control of a Two-Station Brownian Network , 2015, Math. Oper. Res..
[7] Robert J. Wittrock,et al. An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..
[8] J. Lenstra,et al. Job-Shop Scheduling by Implicit Enumeration , 1977 .
[9] Lawrence M. Wein,et al. Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Network with Controllable Inputs , 2011, Oper. Res..
[10] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[11] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[12] Robert E. Tarjan,et al. A Fast Parametric Maximum Flow Algorithm and Applications , 1989, SIAM J. Comput..
[13] B. Berman,et al. Atlas of photoneutron cross sections obtained with monoenergetic photons. Final edition, 1986 , 1986 .
[14] Stanley B. Gershwin,et al. Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.