Experimental earliness/tardiness production planning with the due window system
暂无分享,去创建一个
In order to use the philosophy of JIT to improve the production planning method of MRP-II, we propose the experimental software system of the earliness/tardiness produc tion planning problem with due window. By means of the approaches and model reported in this paper, the optimal production planning can be achieved. The recommended model extends the problem of due window from the shop scheduling level into the aggregated planning level of mass manufacturing systems. Simulation results have demonstrated that the experimental software is a useful tool for the production management of repetitive manufacturing enterprises.