Design for manufacture and assembly (DfMA) enablers for offsite interior design and construction
暂无分享,去创建一个
Tan Tan | Weisheng Lu | Zhikang Bao | Vikrom Laovisutthichai | Qiong Wang | Z. Bao | Weisheng Lu | T. Tan | Vikrom Laovisutthichai | Qiong Wang
[1] Linchuan Yang,et al. To walk or not to walk? Examining non-linear effects of streetscape greenery on walking propensity of older adults , 2021 .
[2] Weisheng Lu,et al. Construction-Oriented Design for Manufacture and Assembly Guidelines , 2020 .
[3] Chengshuang Sun,et al. Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings , 2018 .
[4] Carl T. Haas,et al. Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study , 2020 .
[5] Karen Manley,et al. Exploring the beliefs of Australian prefabricated house builders , 2016 .
[6] Marcus Bjelkemyr,et al. Design for construction: utilizing production experiences in development , 2013 .
[7] Campbell R. Middleton,et al. A Suitability Analysis of Precast Components for Standardized Bridge Construction in the United Kingdom , 2016 .
[8] Mani Rathinam Rajamani,et al. Enhancement of Design for Manufacturing and Assembly Guidelines for Effective Application in Aerospace Part and Process Design , 2020 .
[9] Mª Carmen González-Cruz,et al. Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking , 2019, Automation in Construction.
[10] Ruoyu Jin,et al. Design for manufacture and assembly in construction: a review , 2019, Building Research & Information.
[11] BanksColin,et al. Enhancing high-rise residential construction through design for manufacture and assembly – a UK case study , 2018 .
[12] Rafael Sacks,et al. Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms , 2008, J. Inf. Technol. Constr..
[13] Z. Bao,et al. Design for construction waste minimization: guidelines and practice , 2020, Architectural Engineering and Design Management.
[14] J. Morse,et al. Situating and Constructing Diversity in Semi-Structured Interviews , 2015, Global qualitative nursing research.
[15] Stuart White,et al. Novel solar tower structure to lower plant cost and construction risk , 2016 .
[16] Chi Sun Poon,et al. Design issues of using prefabrication in Hong Kong building construction , 2010 .
[17] Torgeir Welo,et al. Bridging the Gap between High and Low-volume Production through Enhancement of Integrative Capabilities☆ , 2016 .
[18] Aziz Sheikh,et al. The case study approach , 2011, BMC medical research methodology.
[19] B. Flyvbjerg. Five Misunderstandings About Case-Study Research , 2006, 1304.1186.
[20] John Messner,et al. Product-Oriented Information Delivery Framework for Multistory Modular Building Projects , 2017 .
[21] Rahinah Ibrahim,et al. Integrated design approach for improving architectural forms in industrialized building systems , 2013 .
[22] Dominik T. Matt,et al. Parametric and Generative Design techniques in mass-production environments as effective enablers of Industry 4.0 approaches in the Building Industry , 2018, Automation in Construction.
[23] Kisho Kurokawa,et al. Metabolism in architecture , 1977 .
[24] Mehrdad Arashpour,et al. Design for Manufacture and Assembly in Off-Site Construction: Advanced Production of Modular Façade Systems , 2018, Proceedings of the 35th International Symposium on Automation and Robotics in Construction (ISARC).
[25] G. Evans. The built environment and mental health , 2003, Journal of Urban Health.
[26] Stephen Fox,et al. Design for manufacture: A strategy for successful application to buildings , 2001 .
[27] Buie Harwood. Comparing the Standards in Interior Design and Architecture to Assess Similarities and Differences , 1991 .
[28] R. Yin. How to do Better Case Studies: (With Illustrations from 20 Exemplary Case Studies) , 2009 .
[29] Ulrich Rs,et al. Effects of interior design on wellness: theory and recent scientific research. , 1991 .
[30] Hongping Yuan,et al. Procurement innovation for a circular economy of construction and demolition waste: Lessons learnt from Suzhou, China. , 2019, Waste management.
[31] Madhusudan Ranjan Kayyar,et al. DEVELOPMENT OF A DESIGN ENABLER TOOL FOR FRAME ANALYSIS FOR A SMALL ENTERPRISE: A CASE STUDY , 2007 .
[32] Lucinda Kaukas Havenhand. A View from the Margin: Interior Design , 2004, Design Issues.
[33] Deborah Schneiderman. The Prefabricated Interior: Defining the Topic , 2011 .
[34] Dominik T. Matt,et al. Design for Mass Customization: Rethinking Prefabricated Housing Using Axiomatic Design , 2017 .
[35] L. Given,et al. The SAGE encyclopedia of qualitative research methods , 2011 .
[36] Samuel H. Huang,et al. Design for manufacture and design for `X`: concepts, applications, and perspectives , 2001 .
[37] Alistair G.F. Gibb,et al. Standardization and pre-assembly- distinguishing myth from reality using case study research , 2001 .
[38] Hisham Said,et al. Prefabrication Best Practices and Improvement Opportunities for Electrical Construction , 2015 .
[39] Linchuan Yang,et al. A geographically weighted regression model augmented by Geodetector analysis and principal component analysis for the spatial distribution of PM2.5 , 2020 .
[40] Khairul Baharein Mohd Noor. Case Study: A Strategic Research Methodology , 2008 .
[41] Frank Ching. Interior Design Illustrated , 1987 .
[42] S. Ramabalan,et al. Integration of DFE and DFMA for the sustainable development of an automotive component , 2016 .
[43] Chauncey E. Wilson. Semi-Structured Interviews , 2014 .
[44] Chi Sun Poon,et al. Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .
[45] Jack Steven Goulding,et al. Managing information flow and design processes to reduce design risks in offsite construction projects , 2019, Engineering, Construction and Architectural Management.
[46] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[47] Sui Pheng Low,et al. Design for manufacturing and assembly (DfMA): a preliminary study of factors influencing its adoption in Singapore , 2018, Architectural Engineering and Design Management.
[48] Gj Ger Maas,et al. The Bollard—the lessons learned from an unusual example of off-site construction , 2004 .
[49] John Meiling,et al. Towards a feedback model for off-site construction , 2009 .