Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems
暂无分享,去创建一个
[1] S. K. Mukhopadhyay,et al. A heuristic procedure for loading problems in flexible manufacturing systems , 1992 .
[2] Kripa Shanker,et al. Comparing the effectiveness of workload balancing objectives in FMS loading , 2001 .
[3] Sung Shick Kim,et al. Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation , 2003, Comput. Ind. Eng..
[4] Min-Hong Han,et al. Real-time tool control and job dispatching in flexible manufacturing systems , 1989 .
[5] G. J. Gaalman,et al. Tool sharing in an FMS—A feasibility study , 1987 .
[6] Hoda A. ElMaraghy. Automated tool management in flexible manufacturing , 1985 .
[7] Jerry L. Sanders,et al. Performance analysis of a LIM-based high-speed tool delivery system for machining , 1994 .
[8] Kathryn E. Stecke,et al. Design, planning, scheduling, and control problems of flexible manufacturing systems , 1985 .
[9] Kathryn E. Stecke,et al. A synthesis of decision models for tool management in automated manufacturing , 1993 .
[10] Yahya Fathi,et al. Heuristic procedures for the parallel machine problem with tool switches , 2002 .
[11] Pyung-Hoi Koo,et al. Tool requirements in manufacturing systems under dynamic tool sharing , 1997 .
[12] Manoj Kumar Tiwari,et al. Solving the machine-loading problem in a flexible manufacturing system using a combinatorial auction-based approach , 2004 .
[13] Suresh K. Khator,et al. Analysis of tool sharing in an FMS: a simulation study , 1996 .
[14] Sohyung Cho,et al. High performance loading robot design for a tool-delivery system , 2002 .
[15] Manoj Kumar Tiwari,et al. Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach , 2000 .
[16] Nebil Buyurgan,et al. Tool allocation in flexible manufacturing systems with tool alternatives , 2004 .
[17] S. K. Mukhopadhyay,et al. Priority-based tool allocation in a flexible manufacturing system , 1996 .
[18] Rahul Rai,et al. Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm , 2002 .
[19] John J. Bernardo,et al. Tool planning models for flexible manufacturing systems , 1997 .
[20] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[21] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[22] G. K. Nayak,et al. Part type selection, machine loading and part type volume determination problems in FMS planning , 1998 .
[23] Kathryn E. Stecke,et al. A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems , 1986 .
[24] Jiyin Liu,et al. A new classification scheme for flexible manufacturing systems , 1993 .
[25] P.-H. Koo. Real-time operation and tool selection in single stage multimachine systems , 1999 .
[26] 노환균,et al. Due-date based loading and scheduling methods in a flexible manufacturing system with an automatic tool transporter = 공구이송이 가능한 유연제조시스템에서 납기를 고려한 부품과 공구 할당 및 일정 계획에 관한 연구 , 1996 .
[27] Manish Kumar Singh,et al. FMS machine loading: A simulated annealing approach , 1998 .