Project risk identification and analysis based on group decision making methodology in a fuzzy environment
暂无分享,去创建一个
Ahmad Makui | S. Meysam Mousavi | S. M. Mousavi | S. Mohammad H. Mojtahedi | A. Makui | M. Mojtahedi | S. Mojtahedi | M. Mousavi
[1] Patrick X.W. Zou,et al. Understanding the key risks in construction projects in China , 2007 .
[2] S.M. Mousavi,et al. Risk identification and analysis concurrently: Group Decision Making afpproach , 2008, 2008 4th IEEE International Conference on Management of Innovation and Technology.
[3] B. Krause,et al. Multi-criteria decision making in German automotive industry using fuzzy logic , 1994 .
[4] Jong H. Ock,et al. Pricing construction risk: fuzzy set application , 1993 .
[5] Nigel J. Smith,et al. Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .
[6] Timothy J. Ross,et al. A Fuzzy Multi-objective Approach to Risk Management , 1995 .
[7] S. Ebrahimnejad,et al. A fuzzy BOT project risk evaluation model in iranian power plant industry , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.
[8] M. J. Mawdesley,et al. Perception of human risk factors in construction projects: an exploratory study , 2004 .
[9] David Hillson,et al. Extending the risk process to manage opportunities , 2002 .
[10] Osama Moselhi. Pricing Construction Risk: Fuzzy Set Application , 1995 .
[11] Gwo-Hshiung Tzeng,et al. Group decision-making based on concepts of ideal and anti-ideal points in a fuzzy environment , 2007, Math. Comput. Model..
[12] J. Perry,et al. RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .
[13] Zhongsheng Hua,et al. A note on group decision-making based on concepts of ideal and anti-ideal points in a fuzzy environment , 2007, Math. Comput. Model..
[14] John Raftery,et al. Risk Analysis in Project Management , 1993 .
[15] S. Farid Mousavi,et al. TQM consultant selection in SMEs with TOPSIS under fuzzy environment , 2009, Expert Syst. Appl..
[16] Robert J. Chapman,et al. The effectiveness of working group risk identification and assessment techniques , 1998 .
[17] Ching-Lai Hwang,et al. Multiple Attribute Decision Making: Methods and Applications - A State-of-the-Art Survey , 1981, Lecture Notes in Economics and Mathematical Systems.
[18] Mao-Jiun J. Wang,et al. A MULTIPLE CRITERIA LINGUISTIC DECISION-MODEL (MCLDM) FOR HUMAN DECISION-MAKING , 1994 .
[19] Marcello Braglia,et al. Fuzzy TOPSIS approach for failure mode, effects and criticality analysis , 2003 .
[20] Love Ekenberg,et al. A framework for analysing decisions under risk , 1998 .
[21] Deng Yong. Plant location selection based on fuzzy TOPSIS , 2006 .
[22] Roger Flanagan,et al. Risk Management and Construction , 1993 .
[23] Roozbeh Kangari. Construction risk management , 1988 .
[24] Ana Nieto-Morote,et al. A fuzzy approach to construction project risk assessment , 2011 .
[25] T. Chu,et al. A Fuzzy TOPSIS Method for Robot Selection , 2003 .
[26] A. Thorpe,et al. Contractor project risks contingency allocation using linguistic approximation , 1993 .
[27] T. Chu. Selecting Plant Location via a Fuzzy TOPSIS Approach , 2002 .
[28] Jan Erik Vinnem,et al. A decision framework for risk management, with application to the offshore oil and gas industry , 2007, Reliab. Eng. Syst. Saf..
[29] S. Alborzi,et al. An analysis of project risks using the non-parametric bootstrap technique , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.
[30] K. Nakamura. Preference relations on a set of fuzzy utilities as a basis for decision making , 1986 .
[31] Jan Erik Vinnem,et al. On the use of risk acceptance criteria in the offshore oil and gas industry , 2005, Reliab. Eng. Syst. Saf..
[32] G. Wu,et al. Risk Assessment for Construction Joint Ventures in China , 2001 .
[33] K. Ahn,et al. Assessment of the potential applicability of fuzzy set theory to accident progression event trees with phenomenological uncertainties , 1992 .
[34] Soung Hie Kim,et al. Using analytic network process and goal programming for interdependent information system project selection , 2000, Comput. Oper. Res..
[35] C. Carlsson. Tackling an MCDM-problem with the help of some results from fuzzy set theory , 1982 .
[36] Joseph H. M. Tah,et al. Risk interdependencies and natural language computations , 1996 .
[37] Lotfi A. Zadeh,et al. The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .
[38] Robert J. Chapman,et al. The controlling influences on effective risk identification and assessment for construction design management , 2001 .
[39] Gin-Shuh Liang,et al. Using fuzzy MCDM to select partners of strategic alliances for liner shipping , 2005, Inf. Sci..
[40] S. Mojtahedi,et al. A two-phase fuzzy decision making methodology for bridge scheme selection , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.
[41] Kalle Kähkönen. Programming and Scheduling Techniques , 2012 .
[42] J. Kacprzyk. Group decision making with a fuzzy linguistic majority , 1986 .
[43] S. M. Mousavi,et al. A Non-Parametric Statistical Approach for Analyzing Risk Factor Data in Risk Management Process , 2009 .
[44] Joseph H. M. Tah,et al. Towards a framework for project risk knowledge management in the construction supply chain , 2001 .
[45] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[46] Joseph H. M. Tah,et al. A fuzzy approach to constuction project risk assessment and analysis: construction project risk management system , 2001 .
[47] H. Zimmermann,et al. Fuzzy Set Theory and Its Applications , 1993 .
[48] Timothy J. Ross,et al. A Fuzzy Logic Paradigm for Fault Trees and Event Trees in Risk Assessment , 1996 .
[49] J. U. M. Smith,et al. Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..
[50] S. Ebrahimnejad,et al. A model for risk evaluation in construction projects based on fuzzy MADM , 2008, 2008 4th IEEE International Conference on Management of Innovation and Technology.
[51] Shinhong Kim,et al. An integrated approach for interdependent information system project selection , 2001 .
[52] Ying-Ming Wang,et al. Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment , 2006, Expert Syst. Appl..
[53] Chen-Tung Chen,et al. Extensions of the TOPSIS for group decision-making under fuzzy environment , 2000, Fuzzy Sets Syst..
[54] G. Tzeng,et al. Evaluating sustainable fishing development strategies using fuzzy MCDM approach , 2005 .
[55] E. Stanley Lee,et al. An extension of TOPSIS for group decision making , 2007, Math. Comput. Model..
[56] Irem Dikmen,et al. Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .
[57] ChenChen-Tung. Extensions of the TOPSIS for group decision-making under fuzzy environment , 2000 .
[58] Jamal F. Al‐Bahar,et al. Systematic Risk Management Approach for Construction Projects , 1990 .
[59] Chen-Tung Chen,et al. Aggregation of fuzzy opinions under group decision making , 1996, Fuzzy Sets Syst..
[60] Gwo-Hshiung Tzeng,et al. A hierarchy fuzzy MCDM method for studying electronic marketing strategies in the information service industry , 1998 .
[61] Chung-Tsen Tsao,et al. Evaluating investment values of stocks using a fuzzy TOPSIS approach , 2003 .
[62] Shyi-Ming Chen,et al. A new method for tool steel materials selection under fuzzy environment , 1997, Fuzzy Sets Syst..
[63] R. Tavakkoli-Moghaddam,et al. Fuzzy multi criteria decision making method for temporary storage design in industrial plants , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.