Problems in commissioning test of 130 t/h circulating fluidized bed boiler

The structure and features of the new 130 t/h circulating fluidized bed boiler (CFBB) No1 in Cogeneration Power Plant of Donta Group Co.,Ltd.are described.The analysis of the problems encountered in the boiler commissioning test and the treatment are presented as well.