Computer-aided site layout planning

This paper presents an interactive computer-aided site layout model to support site planning in a computer-aided design (CAD) environment and expands upon a model presented earlier by the writers. The developed model performs its task at two levels: Site representation, and site space analysis and allocation. The site representation is carried out using an open architecture supported by object-based concepts. The model offers three tiers of objects: (1) site objects, (2) construction objects, and (3) constraint objects. This structure facilitates the creation of new objects and reuse of domain knowledge, which allows for the gradual expansion and enrichment of the model's knowledge base. At the space analysis and allocation level, the model introduces a geometric reasoning approach to analyze site space for finding an optimum or near-optimum location for facilities. This feature facilitates easy visualization of the site planning process and encourages user participation. The model is structured in three main modules: Database, Project Module, and Layout Control Module. The functionality of each module, along with their interconnectivity is described. The model is implemented using Visual Basic for Applications in AutoCAD environment and Microsoft Access. A numerical example of an actual site layout is presented to illustrate the functionality of the developed model.

[1]  Iris D. Tommelein,et al.  Site‐Layout Modeling: How Can Artificial Intelligence Help? , 1992 .

[2]  Chi Ming Tam,et al.  Relationship between construction safety signs and symbols recognition and characteristics of construction personnel , 2003 .

[3]  Mohammad S. Kiumarse Zamanian Modeling and communicating spatial and functional information about constructed facilities , 1992 .

[4]  Farnaz Sadeghpour A CAD-based model for site layout , 2004 .

[5]  Osama Moselhi,et al.  A CAD-based model for site planning , 2004 .

[6]  Haidar M. Harmanani,et al.  Genetic Algorithm for Solving Site Layout Problem with Unequal-Size and Constrained Facilities , 2002 .

[7]  Peter B. Gibbons,et al.  Facilities Layout Adjacency Determination: An Experimental Comparison of Three Graph Theoretic Heuristics , 1985, Oper. Res..

[8]  Tarek Hegazy,et al.  EvoSite: Evolution-Based Model for Site Layout Planning , 1999 .

[9]  Sabah Alkass,et al.  Open Architecture for Site Layout Modeling , 2003 .

[10]  Peter E.D. Love,et al.  Site-Level Facilities Layout Using Genetic Algorithms , 1998 .

[11]  Iris D. Tommelein,et al.  Interactive Dynamic Layout Planning , 1993 .

[12]  Ulrich Flemming,et al.  Adaptation of a Layout Design System to a New Domain: Construction Site Layouts , 1996 .

[13]  Ulrich Flemming,et al.  Schematic Layout Design in SEED Environment , 1995 .

[14]  George F. Luger,et al.  Artificial Intelligence and the Design of Expert Systems , 1990 .

[15]  Pierrette P. Zouein,et al.  Space Scheduling for Construction Progress Planning and Control , 1993 .

[16]  Iris D. Tommelein,et al.  SightPlan Experiments: Alternate Strategies for Site Layout Design , 1991 .

[17]  Saad H.S. Al-Jibouri,et al.  GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING , 2002 .

[18]  Koshy Varghese,et al.  Optimization of Construction Site Layout - A Genetic Algorithm Approach , 1997 .

[19]  Iris D. Tommelein,et al.  SightPlan Model for Site Layout , 1992 .

[20]  L. R. Foulds Techniques for Facilities Layout: Deciding which Pairs of Activities Should be Adjacent , 1983 .

[21]  Jean Pierre Brans,et al.  HOW TO SELECT AND HOW TO RANK PROJECTS: THE PROMETHEE METHOD , 1986 .

[22]  Iris D. Tommelein,et al.  A knowledge-level analysis of several design tools , 1991 .

[23]  I-Cheng Yeh Construction-Site Layout Using Annealed Neural Network , 1995 .

[24]  Arthur W. T. Leung,et al.  Site layout planning using nonstructural fuzzy decision support system , 2002 .

[25]  Haidar M. Harmanani,et al.  An Evolutionary Algorithm for Solving the Geometrically Constrained Site Layout Problem , 2000 .

[26]  Pierrette P. Zouein MoveSchedule: A planning tool for scheduling space use on construction sites. , 1995 .

[27]  C. M. Tam,et al.  GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction , 2003 .