Multi‐variable parameter estimation to increase confidence in hydrological modelling
暂无分享,去创建一个
[1] Henrik Madsen,et al. Automatic calibration of a conceptual rainfall-runoff model using multiple objectives. , 2000 .
[2] L. P. Graham. Modeling runoff to the Baltic Sea , 1999 .
[3] L. Phil Graham,et al. On the scale problem in hydrological modelling , 1998 .
[4] Soroosh Sorooshian,et al. Toward improved calibration of hydrologic models: Multiple and noncommensurable measures of information , 1998 .
[5] Maja Brandt,et al. Modelling nitrogen transport and retention in the catchments of southern Sweden , 1998 .
[6] Göran Lindström,et al. Development and test of the distributed HBV-96 hydrological model , 1997 .
[7] Göran Lindström,et al. Development of an automatic calibration scheme for the HBV hydrological model , 1997 .
[8] George Kuczera,et al. The quest for more powerful validation of conceptual catchment models , 1997 .
[9] Göran Lindström,et al. A Simple Automatic Calibration Routine for the HBV Model , 1997 .
[10] V. Singh,et al. The HBV model. , 1995 .
[11] Maja Brandt,et al. Integration of Field Data into Operational Snowmelt-Runoff Models , 1994 .
[12] A. Jakeman,et al. How much complexity is warranted in a rainfall‐runoff model? , 1993 .
[13] Keith Beven,et al. Prophecy, reality and uncertainty in distributed hydrological modelling , 1993 .
[14] J. Harlin,et al. Spillway design floods In Sweden: II. Applications and sensitivity analysis , 1992 .
[15] Göran Lindström,et al. Spillway design floods in Sweden: I. New guidelines , 1992 .
[16] Keith Beven,et al. The future of distributed models: model calibration and uncertainty prediction. , 1992 .
[17] J. Harlin,et al. Re-evaluation of hydrological dam safety in Sweden , 1992 .
[18] S. Bergström,et al. Principles and Confidence in Hydrological Modelling , 1991 .
[19] B. Vehviläinen,et al. The effects of climate change on discharges and snow cover in Finland , 1991 .
[20] Lotta Andersson,et al. Soil-moisture deficit simulations with models of varying complexity for forest and grassland sites in Sweden and the U.K. , 1991 .
[21] J. Harlin. Development of a Process Oriented Calibration Scheme for the HBV Hydrological Model , 1991 .
[22] Maja Brandt. SIMULATION OF RUNOFF AND NITRATE TRANSPORT FROM MIXED BASINS IN SWEDEN , 1990 .
[23] Richard P. Hooper,et al. A multisignal automatic calibration methodology for hydrochemical models: A case study of the Birkenes Model , 1988 .
[24] Lotta Andersson. Hydrological analysis of basin behaviour from soil moisture data , 1988 .
[25] Göran Lindström,et al. Modelling Water Exchange and Transit Times in Till Basins Using Oxygen-18: Paper presented at the Nordic Hydrological Conference (Reykjavik, Iceland, August – 1986) , 1986 .
[26] Göran Lindström,et al. Modelling Water Exchange and Transit Times in Till Basins Using Oxygen-18 , 1986 .
[27] V. Klemeš,et al. Dilettantism in hydrology: Transition or destiny? , 1986 .
[28] S. Bergström,et al. Integrated modelling of runoff, alkalinity, and pH on a daily basis , 1985 .
[29] S. Bergström,et al. Simulation of Groundwater Response by Conceptual Models , 1983 .
[30] S. Bergström,et al. THE DEVELOPMENT OF A SNOW ROUTINE FOR THE HBV-2 MODEL , 1975 .
[31] S. Bergström,et al. DEVELOPMENT OF A CONCEPTUAL DETERMINISTIC RAINFALL-RUNOFF MODEL , 1973 .
[32] J. Nash,et al. River flow forecasting through conceptual models part I — A discussion of principles☆ , 1970 .