Batching decisions: structure and models
暂无分享,去创建一个
[1] Yves Pochet. Valid inequalities and separation for capacitated economic lot sizing , 1988 .
[2] E. Silver,et al. A heuristic solution procedure for the multi-item, single-level, limited capacity, lot-sizing problem , 1981 .
[3] Liliane Pintelon,et al. Production Batching with Machine Breakdowns and Safety Stocks , 1992, Oper. Res..
[4] Robert C. Leachman,et al. A general framework for modeling production , 1989 .
[5] Suresh Chand,et al. Lot sizes and setup frequency with learning in setups and process quality , 1989 .
[6] A. Federgruen,et al. A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0n log n or 0n Time , 1991 .
[7] S. Selcuk Erenguc,et al. A transportation type aggregate production model with bounds on inventory and backordering , 1988 .
[8] Edward A Silver,et al. Coordinated replenishments of items under time‐varying demand: Dynamic programming formulation , 1979 .
[9] Xavier de Groote,et al. Flexibility and product variety in lot-sizing models , 1994 .
[10] John F. Mahon,et al. Management: Functions and Responsibilities , 1989 .
[11] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[12] Linus Schrage,et al. Analysis of the deterministic ( s, S ) inventory problem , 1992 .
[13] J. D. Johannes,et al. Systems Simulation: The Art and Science , 1975, IEEE Transactions on Systems, Man, and Cybernetics.
[14] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[15] Ralph Badinelli,et al. A Model for Continuous-Review Pull Policies in Serial Inventory Systems , 1992, Oper. Res..
[16] U. Karmarkar,et al. Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .
[17] Leroy B. Schwarz,et al. Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .
[18] Uday S. Karmarkar,et al. Batching to minimize flow times on one machine , 1987 .
[19] Henk Tijms,et al. Simple approximations for the reorder point in periodic and continuous review (s, S) inventory systems with service level constraints , 1984 .
[20] John O. McClain,et al. Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .
[21] Uday S. Karmarkar,et al. Multi-item batching heuristics for minimization of queueing delays , 1992 .
[22] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[23] H. Wiendahl. Die belastungsorientierte Fertigungssteuerung , 1992 .
[24] Dev Joneja,et al. Multi-Echelon Assembly Systems with Nonstationary Demands: Heuristics and Worst Case Performance Bounds , 1991, Oper. Res..
[25] Dev Joneja,et al. The Joint Replenishment Problem: New Heuristics and Worst Case Performance Bounds , 1990, Oper. Res..
[26] Willard I. Zangwill,et al. A Deterministic Multiproduct, Multi-Facility Production and Inventory Model , 1966, Oper. Res..
[27] S. S. Erenguc,et al. Multi‐Item Inventory Models with Co‐ordinated Replenishments: A Survey , 1988 .
[28] Gregory Dobson. The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups , 1992, Oper. Res..
[29] W. Maxwell,et al. The Joint Replenishment Problem with a Powers-of-Two Restriction , 1985 .
[30] Mihalis Yannakakis,et al. Batch sizing and job sequencing on a single machine , 1991 .
[31] Robin O. Roundy,et al. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .
[32] Yaakov Roll,et al. Multi-item, multi-level lot sizing with an aggregate capacity constraint , 1991 .
[33] Horst Tempelmeier,et al. A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures , 1994 .
[34] Robert C. Leachman,et al. A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem , 1988, Oper. Res..
[35] Dennis E. Kroll,et al. The incorporation of learning in production planning models , 1989 .
[36] Candace Arai Yano,et al. Cyclic scheduling to minimize inventory in a batch flow line , 1994 .
[37] F. Robert Jacobs,et al. A Comparison of Reorder Point and Material Requirements Planning Inventory Control Logic , 1992 .
[38] B. Fleischmann. The discrete lot-sizing and scheduling problem , 1990 .
[39] Paul S. Dixon,et al. Heuristic Procedures for Multi-Item Inventory Planning with Limited Storage , 1990 .
[40] M. Cooper,et al. Customer Service: A Management Perspective , 1988 .
[41] Paul H. Zipkin,et al. Models for Design and Control of Stochastic, Multi-Item Batch Production Systems , 1986, Oper. Res..
[42] Laurence A. Wolsey,et al. Uncapacitated Lot-Sizing Problems with Start-Up Costs , 1989, Oper. Res..
[43] Jaya P. Moily,et al. Optimal and heuristic procedures for component log-splitting in multi-stage manufacturing systems , 1986 .
[44] Hoesel van Cpm,et al. A linear description of the discrete lot-sizing and scheduling problem , 1994 .
[45] Alan S. Manne,et al. Programming of Economic Lot Sizes , 1958 .
[46] Arnoldo C. Hax,et al. Production and inventory management , 1983 .
[47] P. C. Jones,et al. When Is The Economic Lot Scheduling Problem Easy , 1989 .
[48] Jatinder N. D. Gupta,et al. OR Practice - Determining Lot Sizes and Resource Requirements: A Review , 1987, Oper. Res..
[49] Sven Axsäter,et al. Control theory concepts in production and inventory control , 1985 .
[50] Edward A. Silver,et al. Lot sizing for a product subject to obsolescence or perishability , 1994 .
[51] William W. Trigeiro,et al. Capacitated lot sizing with setup times , 1989 .
[52] E. Arkin,et al. Computational complexity of uncapacitated multi-echelon production planning problems , 1989 .
[53] E. M. L. Beale,et al. Solution of a Purchase-Storage Programme , 1958 .
[54] Ludo Gelders,et al. Lot sizing under dynamic demand conditions: A review , 1984 .
[55] Jatinder N. D. Gupta,et al. Determining lot sizes and resource requirements: A review , 1987 .
[56] G. Bitran,et al. Computational Complexity of the Capacitated Lot Size Problem , 1982 .
[57] E. Silver. Inventory control under a probabilistic time-varying, demand pattern , 1978 .
[58] Vincent A. Mabert,et al. Cyclical schedules for capacitated lot sizing with dynamic demands , 1991 .
[59] Göran Persson,et al. Achieving Competitiveness Through Logistics , 1991 .
[60] S. Graves. The Multi-Product Production Cycling Problem , 1980 .
[61] V. Aggarwal. Robustness of the partitions in grouping multi-item inventories , 1984 .
[62] Uday S. Karmarkar,et al. The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..
[63] Derek Atkins,et al. A simple lower bound to the dynamic assembly problem , 1994 .
[64] S. G. Deshmukh,et al. Integrated procurement-production systems: A review , 1992 .
[65] Wu Zhang,et al. On practical resource allocation for production planning and scheduling with period overlapping setups , 1994 .
[66] Suresh P. Sethi,et al. A Dynamic Lot Sizing Model with Learning in Setups , 1990, Oper. Res..
[67] Chien-Hua M. Lin,et al. An effective algorithm for the capacitated single item lot size problem , 1994 .
[68] Karen Aardal,et al. Decomposition principles applied to the dynamic production and work-force scheduling problem , 1987 .
[69] L. V. Wassenhove,et al. Multilevel capacitated lotsizing complexity and LP-based heuristics , 1991 .
[70] Stephen F. Love. A Facilities in Series Inventory Model with Nested Schedules , 1972 .
[71] José Juan Carreño. Economic Lot Scheduling for Multiple Products on Parallel Identical Processors , 1990 .
[72] Edward A. Silver,et al. Changing the givens in modelling inventory problems: the example of just-in-time systems , 1992 .
[73] E. J. Anderson,et al. Deterministic Lotsizing Models for Production Planning , 1991 .
[74] J. Lasserre. An Integrated Model for Job-Shop Planning and Scheduling , 1992 .
[75] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[76] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[77] Uday S. Karmarkar,et al. A Closed Loop Automatic Scheduling System (Class) , 1992 .
[78] M. K. El-Najdawi. A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes , 1994 .
[79] Apm Wagelmans,et al. Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions , 1994 .
[80] Donald Erlenkotter,et al. An early classic misplaced: Ford W. Harris's economic order quantity model of 1915 , 1989 .
[81] Paul H. Zipkin,et al. Tandem Queues with Planned Inventories , 1992, Oper. Res..
[82] Ömer Kirca,et al. A new heuristic approach for the multi-item dynamic lot sizing problem , 1994 .
[83] Gregory Dobson,et al. The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..
[84] Arthur F. Veinott,et al. Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems , 1969, Oper. Res..
[85] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[86] Luk N. Van Wassenhove,et al. Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review , 1988 .
[87] Alok Aggarwal,et al. Improved Algorithms for Economic Lot Size Problems , 1993, Oper. Res..
[88] Awi Federgruen,et al. The Joint Replenishment Problem with General Joint Cost Structures , 1992, Oper. Res..
[89] Awi Federgruen,et al. Finding Optimal (s, S) Policies Is About As Simple As Evaluating a Single Policy , 1991, Oper. Res..
[90] Ford W. Harris,et al. How Many Parts to Make at Once , 1990, Oper. Res..
[91] Thomas L. Magnanti,et al. Facets and algorithms for capacitated lot sizing , 1989, Math. Program..
[92] L. V. Wassenhove,et al. Some extensions of the discrete lotsizing and scheduling problem , 1991 .
[93] John I. S. Hsu,et al. Common cycle scheduling in a multistage production process , 1990 .
[94] Celia A. Glass. Feasibility of scheduling lot sizes of three products on one machine , 1992 .
[95] L. J. Thomas,et al. Heuristics for multilevel lot-sizing with a bottleneck , 1986 .
[96] Larry R. Dolinsky,et al. Adjusting replenishment orders to reflect learning in a material requirements planning environment , 1990 .
[97] Donald B. Rosenfield,et al. Modern Logistics Management: Integrating Marketing, Manufacturing and Physical Distribution , 1985 .
[98] Marc Salomon,et al. The single item discrete lotsizing and scheduling problem : linear description and optimization , 1989 .
[99] Maurice Queyranne,et al. Lot Sizing Policies for Finite Production Rate Assembly Systems , 1992, Oper. Res..
[100] B. Fleischmann. The discrete lot-sizing and scheduling problem with sequence-dependent setup costs , 1994 .
[101] John L. Bruno,et al. Complexity of Task Sequencing with Deadlines, Set-Up Times and Changeover Costs , 1978, SIAM J. Comput..
[102] B. Sarker,et al. Economic manufacturing quantity in a just-in-time delivery system , 1992 .
[103] Geoff Buxey,et al. Production planning under seasonal demand: A case study perspective , 1988 .
[104] R. Anthony,et al. Planning and Control Systems: A Framework for Analysis , 1965 .
[105] Robert C. Leachman,et al. Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine , 1991 .
[106] Marc Salomon,et al. LINEAR PROGRAMMING, SIMULATED ANNEALING AND TABU SEARCH HEURISTICS FOR LOTSIZING IN BOTTLENECK ASSEMBLY SYSTEMS , 1993 .
[107] Dirk Cattrysse,et al. A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times , 1993 .
[108] Thomas L. Magnanti,et al. A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs , 1990, Oper. Res..
[109] B. L. Dietrich. A Taxonomy of Discrete Manufacturing Systems , 1991, Oper. Res..
[110] Albert P. M. Wagelmans,et al. Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case , 1992, Oper. Res..
[111] Bezalel Gavish,et al. Optimal Lot-Sizing Algorithms for Complex Product Structures , 1986, Oper. Res..
[112] Robert C. Leachman,et al. A Heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands , 1988 .
[113] Clyde L. Monma,et al. On the Complexity of Scheduling with Batch Setup Times , 1989, Oper. Res..
[114] Chris N. Potts,et al. Lot streaming in three-stage production processes , 1994 .
[115] Harish C. Bahl,et al. A linear-programming model formulation for optimal product-mix decisions in material-requirements-planning environments , 1991 .
[116] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[117] Sven Axsäter,et al. Multi-level production-inventory control: Material requirements planning or reorder point policies? , 1994 .
[118] Edward J. Anderson. Testing Feasibility in a Lot Scheduling Problem , 1990, Oper. Res..
[119] E. A. Silver,et al. Impact of processing and queueing times on order quantities , 1985 .
[120] Luk N. Van Wassenhove,et al. Multi Item Single Level Capacitated Dynamic Lotsizing Heuristics: A Computational Comparison (Part I: Static Case) , 1986 .
[121] Panos Afentakis. Simultaneous lot sizing and sequencing for multistage production systems , 1985 .
[122] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[123] Arthur F. Veinott,et al. Analysis of Inventory Systems , 1963 .
[124] Laurence A. Wolsey,et al. Multi-item lot-sizing problems using strong cutting planes , 1991 .
[125] Kaj Rosling,et al. Optimal Lot-Sizing for Dynamic Assembly Systems , 1986 .
[126] A. Federgruen,et al. Coordinated Replenishments in a Multi-Item Inventory System with Compound Poisson Demands , 1984 .
[127] Roger C. Vergin,et al. Scheduling Rules For The Multiple Product Single Machine System With Stochastic Demand , 1978 .
[128] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[129] Evan L. Porteus. Note-The Impact of Inspection Delay on Process and Inspection Lot Sizing , 1990 .
[130] James H. Bookbinder,et al. Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints , 1988 .
[131] Robin Roundy,et al. A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System , 1986, Math. Oper. Res..
[132] G. D. Eppen,et al. Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition , 1987, Oper. Res..
[133] Celia A. Glass,et al. Feasibility of scheduling lot sizes of two frequencies on one machine , 1994 .
[134] W. Zijm,et al. Computational procedures for stochastic multi-echelon production systems , 1991 .
[135] W. Zangwill. From EOQ Towards ZI , 1987 .
[136] Ronald G. Askin. A Procedure for Production Lot Sizing with Probabilistic Dynamic Demand , 1981 .
[137] Bezalel Gavish,et al. A Fully Polynomial Approximation Scheme for Single-Product Scheduling in a Finite Capacity Facility , 1990, Oper. Res..
[138] Rakesh K. Sarin,et al. Simultaneous Product-Mix Planning, Lot Sizing and Scheduling at Bottleneck Facilities , 1991, Oper. Res..
[139] Terry Hill,et al. Production/Operations Management: Text and Cases , 1991 .
[140] Stéphane Dauzère-Pérès,et al. Integration of lotsizing and scheduling decisions in a job-shop , 1994 .
[141] Uday S. Karmarkar,et al. The Dynamic Lot-Sizing Problem with Startup and Reservation Costs , 1987, Oper. Res..
[142] Rasaratnam Logendran,et al. Aggregate production planning — A survey of models and methodologies , 1992 .