A generic approach for the graph-based integrated production and intermodal transport scheduling with capacity restrictions

Abstract The performance of global manufacturing supply chains depends on the interaction of production and transport processes. Currently, the scheduling of these processes is done separately without considering mutual requirements, which leads to non- optimal solutions. An integrated scheduling of both processes enables the improvement of supply chain performance. The integrated production and transport scheduling problem (PTSP) is NP-hard, so that heuristic methods are necessary to efficiently solve large problem instances as in the case of global manufacturing supply chains. This paper presents a heuristic scheduling approach which handles the integration of flexible production processes with intermodal transport, incorporating flexible land transport and maritime transport running a given timetable. The method is based on a graph that allows a reformulation of the PTSP as a shortest path problem for each job, which can be solved in polynomial time. The proposed method is applied to a supply chain scenario with a manufacturing facility in Brazil and shipments to customers in Germany. The obtained results show that the approach is suitable for the scheduling of large-scale problems and can be flexibly adapted to different scenarios.

[1]  Dirk C. Mattfeld,et al.  Terminal operations management in vehicle transshipment , 2003 .

[2]  Enzo Morosini Frazzon,et al.  A Graph Model for the Integrated Scheduling of Intermodal Transport Operations in Global Supply Chains , 2012, LDIC.

[3]  Denis Borenstein,et al.  A decision support system for the single-depot vehicle rescheduling problem , 2007, Comput. Oper. Res..

[4]  George L. Vairaktarakis,et al.  Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..

[5]  H. D. Ratliff,et al.  A branch-and-bound method for the fixed charge transportation problem , 1990 .

[6]  Enzo Morosini Frazzon,et al.  Integrating manufacturing and logistic systems along global supply chains , 2010 .

[7]  Navneet Vidyarthi,et al.  Integrated Production-Inventory-Distribution System Design with Risk Pooling: Model Formulation and Heuristic Solution , 2007, Transp. Sci..

[8]  Guruprasad Pundoor,et al.  Joint cyclic production and delivery scheduling in a two-stage supply chain , 2009 .

[9]  Paul A. Rubin,et al.  A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times , 2000 .

[10]  Cathy Macharis,et al.  Opportunities for OR in intermodal freight transport research: A review , 2004, Eur. J. Oper. Res..

[11]  Josefa Mula,et al.  Mathematical programming models for supply chain production and transport planning , 2010, Eur. J. Oper. Res..

[12]  Rajagopalan Srinivasan,et al.  Critical evaluation of paradigms for modelling integrated supply chains , 2009, Comput. Chem. Eng..

[13]  Edsger W. Dijkstra,et al.  A note on two problems in connexion with graphs , 1959, Numerische Mathematik.

[14]  Sheldon H. Jacobson,et al.  A BB&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup times , 2012, J. Glob. Optim..

[15]  Enzo Morosini Frazzon,et al.  AN APPROACH FOR THE INTEGRATION OF PRODUCTION SCHEDULING AND INTER-FACILITY TRANSPORTATION WITHIN GLOBAL SUPPLY CHAINS , 2010 .