A Case Study of Production Improvement by Using Lean with Simulation Modeling

The aim of this research is to study the effect of the shift from the traditional style of production to the application of modern techniques of lean in one of the old Iraqi industries to improve the flow of production and demand processing by reducing line intersections with optimal usage of available facilities. Value stream mapping, (VSM) have been used to represent the production flow line. Therefore, two VSMs have been drawn, one to represent the current or actual status of the production flow line and the other to represent the modified-status after eliminating most of the identified wastes (non-value activities). ARENA software has used to develop the simulation models, with applying pull system of lean tools for the modified status instead of the push system that has used in the traditional style of production. Thus, numbers of add values (AV) have been obtained over several periods of runtime for the designed simulation models. According to those add values, the modified status model proved that a reduction in work-in-process (WIP) by 52% at both of inventory and process levels could be obtained, in addition to other important results, which have been verified.

[1]  John Paul Macduffie,et al.  Creating Lean Suppliers: Diffusing Lean Production through the Supply Chain , 1997 .

[2]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[3]  Rachna Shah,et al.  Defining and developing measures of lean production , 2007 .

[4]  Jeffrey K. Liker,et al.  A simulation study of pull system responsiveness considering production condition influences , 2007 .

[5]  Fawaz M. Abdullah,et al.  LEAN MANUFACTURING TOOLS AND TECHNIQUES IN THE PROCESS INDUSTRY WITH A FOCUS ON STEEL , 2003 .

[6]  Michelle E. Scullin Integrating Value Stream Mapping and Simulation , 2005 .

[7]  Charles R. Standridge,et al.  A simulation-enhanced lean design process , 2009 .

[8]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[9]  Mohamed Mohamed Naim,et al.  Applying lean thinking: a case study of an Indian steel plant , 2004 .

[10]  John N. Pearson,et al.  Jit Manufacturing: a Survey of Implementations in Small and Large U.S. Manufacturers , 1999 .

[11]  Rosario Domingo,et al.  Redesigning an assembly line through lean manufacturing tools , 2009 .

[12]  Ravi Shankar,et al.  Lean philosophy: implementation in a forging company , 2008 .

[13]  L. Crocker,et al.  Introduction to Classical and Modern Test Theory , 1986 .

[14]  Cindy Marzec,et al.  VALUE STREAM MAPPING – A CASE STUDY OF CONSTRUCTION SUPPLY CHAINOF PREFABRICATED MASSIVE TIMBER FLOOR ELEMENT , 2007 .

[15]  Amber J. Chesborough Inventory reduction : applying a pull ordering system to a distribution business , 2004 .

[16]  Alireza Esfandyari Reducing Production Lead Time Through Value Stream Mapping , 2008 .

[17]  J. P. T. Mo,et al.  Optimisation and simulation of high speed production system , 2008 .

[18]  António Coelho Value Stream Map and Kaizen Concept Implemented in a Shaft Manufacturing Chain , 2009 .