Two-stage Sequence Generation for Partial Disassembly of Products with Sequence Dependent Task Times

Abstract For disassembly sequence generation, partial disassembly and sequence dependent task times are typically not considered together in the same model. We developed a two-stage optimization program that first determines the optimal partial disassembly sequence according to reuse value only, followed by the second stage that finds the optimal partial disassembly sequence that also includes sequence dependence task times. We prove the optimality of the two-stage approach under the condition that all components with any positive reuse value must be included in the final sequence. If this condition does not need to be met, a task hedging policy is shown to be effective.

[1]  Dong-Ho Lee,et al.  Parallel disassembly sequencing with sequence-dependent operation times , 2001 .

[2]  Jaime A. Camelio,et al.  Partial disassembly sequencing considering acquired end-of-life product age distributions , 2014 .

[3]  Alexandre Dolgui,et al.  Disassembly Line Balancing and Sequencing under Uncertainty , 2014 .

[4]  Manoj Kumar Tiwari,et al.  Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA) , 2009 .

[5]  Bert Bras,et al.  Towards Design for Remanufacturing - Metrics for Assessing Remanufacturability , 1996 .

[6]  Sami Kara,et al.  Selective disassembly sequencing : A methodology for the disassembly of end-of-life products , 2006 .

[7]  W. Eversheim,et al.  A Key Issue in Product Life Cycle: Disassembly , 1993 .

[8]  Surendra M. Gupta,et al.  Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem , 2013, Expert Syst. Appl..

[9]  Surendra M. Gupta,et al.  Disassembly sequence planning for products with defective parts in product recovery , 1998 .

[10]  Jaime A. Camelio,et al.  Multi-objective partial disassembly optimization based on sequence feasibility , 2013 .

[11]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[12]  Nils Boysen,et al.  The sequence-dependent assembly line balancing problem , 2008, OR Spectr..

[13]  S. Jack Hu,et al.  Disassembly line balancing under high variety of end of life states using a joint precedence graph approach , 2015 .

[14]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .

[15]  S. Jack Hu,et al.  Disassembly liaison graphs inspired by word clouds , 2013 .