Feasibility study of 4D CAD in commercial construction

This paper concludes that 4D models are a useful alternative to project scheduling tools like CPM networks and bar charts. They enable more people to understand a schedule quickly and identify potential problems. By developing a 4D model for a commercial construction project, we were able to detect the incompleteness of the original schedule, find inconsistencies in the level of detail among the schedule activities, and discover an impossible schedule sequence. We were also able to anticipate potential time-space conflicts and accessibility problems. The results of the case study show that 4D models are effective in evaluating the executability of a construction schedule. The case study also highlighted the need for improvements to 4D tools. 4D tools should include bar charts, component lists, and annotation tools in their graphical user interface. Automating schedule data preparation and 4D model generation in the design stages of a project can expedite 4D model development and use. Users need to be able to generate 4D models at multiple levels of detail and generate and evaluate alternative scenarios rapidly.

[1]  A. Retik Visualization For Decision Making InConstruction Planning , 1970 .

[2]  Douglas J. Ferry Cost Planning of Buildings , 1980 .

[3]  A. B. Cleveland,et al.  Real-time Animation of Construction Activities , 1989 .

[4]  Kenneth F. Reinschmidt,et al.  Integrated Database for Engineering and Construction , 1989 .

[5]  A. Retik,et al.  Computer-aided integration of multidisciplinary design information , 1996 .

[6]  Kenneth F. Reinschmidt,et al.  Applications of Computer Graphics in Construction , 1989 .

[7]  Arkady Retik,et al.  A library-based 4D visualisation of construction processes , 1997, Proceedings. 1997 IEEE Conference on Information Visualization (Cat. No.97TB100165).

[8]  Martin Fischer,et al.  Opportunities for computer‐aided design for construction , 1998 .

[9]  Raymond E. Levitt,et al.  CE4: Concurrent Engineering of Product, Process, Facility, and Organization , 1996 .

[10]  Yvan J. Beliveau,et al.  SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .

[11]  Martin Fischer,et al.  Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .

[12]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[13]  Martin Fischer,et al.  Construction Perspective of Computer-Aided Design Tools , 1998 .

[14]  Martin Fischer,et al.  Interactive 4D-CAD , 1996 .

[15]  Fletcher Griffis,et al.  Integration of Engineering, Design, and Construction , 1991 .

[16]  Annette L. Stumpf,et al.  Using CADD Application to Support Construction Activities , 1994 .

[17]  Abraham Warszawski,et al.  The use of computer graphics as a scheduling tool , 1989 .

[18]  Florian Aalami,et al.  Scheduling with Computer-Interpretable Construction Method Models , 1996 .

[19]  Robert D. Logcher,et al.  Integrating CAD with Construction‐Schedule Generation , 1991 .

[20]  Frank Vaugn 3D & 4D CAD Modeling on Commercial Design-Build Projects , 1996 .

[21]  Mike Williams,et al.  Graphical Simulation for Project Planning: 4D-Planner T M , 1996 .

[22]  Burcu Akinci,et al.  Productivity and cost analysis based on a 4d model , 1997 .

[23]  Oldrich Stradal,et al.  Time Space Scheduling Method , 1982 .

[24]  Bernd Fröhlich,et al.  Collaborative Production Modeling and Planning , 1997, IEEE Computer Graphics and Applications.

[25]  Clyde B. Tatum,et al.  Construction Site Applications of CAD , 1994 .

[26]  M Phair THE NEXT DIMENSION: VIRTUAL REALITY IS TRANSFORMING CAD MODELS INTO MOVING WORLDS , 1996 .

[27]  Martin Fischer,et al.  4D Analysis of Temporary Support , 1997 .

[28]  John C. Kunz,et al.  Visualization of construction planning information , 1998, IUI '98.

[29]  H. N. Ahuja,et al.  Successful methods in cost engineering , 1983 .

[30]  Arkady Retik,et al.  The applicability of project management software and advanced IT techniques in construction delays mitigation , 1997 .

[31]  Martin Fischer,et al.  Visual-Based Scheduling: 4D Modeling on the San Mateo County Health Center , 1996 .