Optimizing the Planning of Highway Work Zones to Maximize Safety and Mobility

[1]  Bastian J Schroeder,et al.  Generic Speed–Flow Models for Basic Freeway Segments on General-Purpose and Managed Lanes in Undersaturated Flow Conditions , 2015 .

[2]  Ajmal Hamidi,et al.  Issues Related to the Combination of Multiple CMFs , 2012 .

[3]  Patrick T McCoy,et al.  Optimum Length of Single-Lane Closures in Work Zones on Rural Four-Lane Freeways , 1998 .

[4]  Paul Schonfeld,et al.  Optimizing Work Zones for Two-Lane Highway Maintenance Projects , 2002 .

[5]  Leslie K. Norford,et al.  Genetic Algorithms for Optimization of Building Envelopes and the Design and Control of HVAC Systems , 2003 .

[6]  Karin M Bauer,et al.  Safety Effects of Narrow Lanes and Shoulder-Use Lanes to Increase Capacity of Urban Freeways , 2004 .

[7]  Gerald L Ullman,et al.  FUNCTIONAL REQUIREMENTS FOR HIGHLY-PORTABLE POSITIVE PROTECTION TECHNOLOGIES IN WORK ZONES , 2007 .

[8]  Khaled A El-Rayes,et al.  Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .

[9]  Khaled A El-Rayes,et al.  Optimizing Material Procurement and Storage on Construction Sites , 2011 .

[10]  Kalyanmoy Deb,et al.  A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimisation: NSGA-II , 2000, PPSN.

[11]  Lothar Thiele,et al.  Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..

[12]  X. Qu,et al.  A probabilistic quantitative risk assessment model for the long-term work zone crashes. , 2010, Accident; analysis and prevention.

[13]  Khaled A El-Rayes,et al.  Optimizing airport construction site layouts to minimize wildlife hazards , 2006 .

[14]  Khaled A El-Rayes,et al.  An automated system for optimizing post-disaster temporary housing allocation , 2009 .

[15]  Khaled A El-Rayes,et al.  Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects , 2006 .

[16]  Khaled A El-Rayes,et al.  Optimizing Resource Leveling in Construction Projects , 2009 .

[17]  Qiang Meng,et al.  Optimal subwork zone operational strategy for short‐term work zone projects in four‐lane two‐way freeways , 2013 .

[18]  Amr Kandil,et al.  MACROS: Multiobjective Automated Construction Resource Optimization System , 2006 .

[19]  Paul Schonfeld,et al.  A Hybrid Methodology for Freeway Work-Zone Optimization With Time Constraints , 2009 .

[20]  Paul Schonfeld,et al.  Optimal work zone lengths for four-lane highways , 2001 .

[21]  Khaled A El-Rayes,et al.  Optimizing Resource Utilization during the Recovery of Civil Infrastructure Systems , 2010 .

[22]  Amr Kandil,et al.  Optimization Research: Enhancing the Robustness of Large-Scale Multiobjective Optimization in Construction , 2010 .

[23]  Khaled A El-Rayes,et al.  Multiobjective optimization of resource leveling and allocation during construction scheduling , 2011 .

[24]  Khaled El-Rayes,et al.  Time-Profit Trade-Off Analysis for Construction Projects , 2009 .

[25]  Paul Schonfeld,et al.  Work Zone Optimization for Two-Lane Highway Resurfacing Projects with an Alternate Route , 2005 .

[26]  H. B. Zhu,et al.  Analysis of traffic congestion induced by the work zone , 2016 .

[27]  Hojjat Adeli,et al.  Freeway Work Zone Traffic Delay and Cost Optimization Model , 2003 .

[28]  Timothy R. B. Taylor,et al.  Nighttime Construction Issues , 2001 .

[29]  Scott J. Amos,et al.  Development of Work Zone Lighting Standards for Nighttime Highway Work , 1996 .

[30]  Hans Peter Lindenmann,et al.  Algorithm for the Planning of Optimum Highway Work Zones , 2007 .

[31]  Khalied Hyari,et al.  Optimal Planning and Scheduling for Repetitive Construction Projects , 2006 .

[32]  Nicholas J Garber,et al.  Distribution and Characteristics of Crashes at Different Work Zone Locations in Virginia , 2002 .

[33]  Khaled A El-Rayes,et al.  Multi-Objective Optimization of Temporary Housing for the 1994 Northridge Earthquake , 2008 .

[34]  Khaled A El-Rayes,et al.  Optimal Lighting Arrangements for Nighttime Highway Construction Projects , 2005 .

[35]  Khaled A El-Rayes,et al.  Optimal Trade-Offs between Construction Cost and Traffic Delay for Highway Work Zones , 2016 .