Measuring the requirements management key process area
暂无分享,去创建一个
[1] Khaled El Emam,et al. Spice: The Theory and Practice of Software Process Improvement and Capability Determination , 1997 .
[2] P. Krutchen,et al. The Rational Unified Process: An Introduction , 2000 .
[3] Suzanne Garcia,et al. Key Practices of the Capability Maturity Model, Version 1.1 , 1993 .
[4] Mark C. Paulk,et al. Capability Maturity Model for Software, Version 1.1 , 1993 .
[5] Claes Wohlin,et al. Experimentation in software engineering: an introduction , 2000 .
[6] Victor R. Basili,et al. The TAME Project: Towards Improvement-Oriented Software Environments , 1988, IEEE Trans. Software Eng..
[7] Bacmground Bootstrap. Bootstrap: Europe's assessment method , 1993, IEEE Software.
[8] Shari Lawrence Pfleeger,et al. Software Metrics : A Rigorous and Practical Approach , 1998 .
[9] Jared Bruckner. Overcoming cultural barriers to the adoption of object technology , 1997, OOPSLA '97.
[10] John H. Baumert,et al. Software Measures and the Capability Maturity Model , 1992 .
[11] Joseph Raynus. Software Process Improvement With CMM , 1998 .
[12] Donald J. Reifer,et al. Requirements Management: The Search for Nirvana , 2000 .
[13] H. D. Rombach,et al. THE EXPERIENCE FACTORY , 1999 .
[14] Egon Berghout,et al. The Goal/Question/Metric method: a practical guide for quality improvement of software development , 1999 .
[15] Linda H. Rosenberg,et al. Doing Requirements Right the First Time , 1998 .